We’ve made updates to our electric rail system, refining the look while keeping the same focus: efficient material haulage for underground and surface mining.
? 7′ x 7′ profile for a smaller excavation footprint
? Fully electric – no diesel, lower emissions
? Up to 70% less excavation
? Lower CAPEX & OPEX
? Built for mining. Designed to last.

