Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: October 24, 20242024-10-24T07:18:34-04:00 2024-10-24T07:18:34-04:00In: Mining Operations

Overview of the Hollinger gold open pit mine

  • 0
  • 0

The Hollinger Gold Mine is a historically significant mining site located in Timmins, Ontario, Canada. Discovered in 1909 by Benny Hollinger, it became one of the largest gold producers in the British Empire. The mine operated primarily as an underground facility until its closure in 1968 but has since been reactivated as an open-pit operation.

The mine is owned by Newmont Corporation, which acquired Goldcorp in 2019. Goldcorp had purchased the mine in 2016 and initiated the open-pit operations. The site has changed hands several times, initially being developed by a syndicate led by Noah Timmins and later acquired by Kinross Gold in 1999 before Goldcorp’s acquisition.

The Hollinger mine is located above a sequence of Archean basaltic volcanic rocks. Historically, the mining involved various techniques including shrinkage stoping and cut-and-fill methods. The geological setting has allowed for significant gold extraction, with historical production figures indicating around 20 million ounces of gold from both underground and surface operations.

Production Data (2020-2024)
  • 2020: The mine was operational with ongoing production, contributing to Newmont’s overall output.
  • 2021-2023: Exact annual production figures are not specified, but it is part of Newmont’s broader operations in the Porcupine district, which produced approximately 223,000 ounces of gold annually across its sites.
  • 2024: The Hollinger open pit is expected to close at the end of this year. Plans for reclamation are being discussed, focusing on transforming the site into a recreational area rather than flooding it to create a lake as originally envisioned.

As mining operations at Hollinger wind down, Newmont plans to reallocate staff to other projects, such as the newly approved Pamour open pit project. This transition aims to maintain employment levels while ensuring that mining activities continue within the region.

Sources:

https://northernontario.travel/timmins/hollinger-open-pit-lookout

https://www.newmont.com/operations-and-projects/global-presence/north-america/porcupine-canada/default.aspx

https://www.srk.com/en/publications/hollinger-open-pit-operational-support

0
  • 0 0 Comments
  • 4k Views
  • 4k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How to optimize blast fragmentation to reduce downstream crusher bottlenecks without increasing vibration complaints?
  • Lase Bulk Solutions - from Pit to Port
  • What are the operational criteria for declaring a highwall failure risk and implementing an emergency evacuation protocol in an open-pit ...

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Protected: Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing
    • On: August 19, 2026

    Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing

  • Should You Buy Mobile Crushing Plant Equipment During a Mining Downturn?
    • On: August 17, 2026

    Should You Buy Mobile Crushing Plant Equipment During a Mining ...

  • Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability
    • On: August 14, 2026

    Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability

  • Mobile Jaw Crusher for Sale for Hard Rock Mining: How to Configure Equipment for Demanding Crushing Conditions
    • On: August 12, 2026

    Mobile Jaw Crusher for Sale for Hard Rock Mining: How ...

  • From Raw Stone to Construction Aggregate: The Complete Processing Process
    • On: August 12, 2026

    From Raw Stone to Construction Aggregate: The Complete Processing Process

  • Using a Ready Mix Concrete Batching Plant for Mining Tunnel Lining and Shaft Construction
    • On: August 11, 2026

    Using a Ready Mix Concrete Batching Plant for Mining Tunnel ...

  • High-Altitude Motor and Power Selection for Andean Mining Mills
    • On: August 11, 2026

    High-Altitude Motor and Power Selection for Andean Mining Mills

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved