Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining DocExplainer
Added: February 17, 20252025-02-17T06:33:10-05:00 2025-02-17T06:33:10-05:00In: Mining Operations

What are the guidelines for blasting geometry?

  • 1
  • 1
RULE 1: The distance between holes (spacing) should not be greater than one-half the depth of the borehole.

When the effect of a blast is simulated on graph paper using an assumed or idealized angle of breakage of 90 degrees, the diagrams indicate that in each instance where the distance between holes in a row is greater than one-half the depth of the hole, the angles of breakage intersect so far above the bottom of the holes that the primary relief for each hole is to the surface. This causes both a great deal of vertical throw and a very uneven bottom. The greater the disparity between depth and spacing, the more pronounced the effect will be, to the point where the angles of breakage intersect above the surface of the shot.

RULE 2: In any blast where there is hole-for-hole delay, the spacing to burden relationship should be seven to five.

Several investigations about the science of rock mechanics have suggested that the optimum spacing to burden relationship should be 2:1, with the burden equal to one-half the spacing. Field experience shows that this relationship has two drawbacks. First, the blaster may assume that this relationship will apply when there is no delay system at work, when in fact, the optimum spacing to burden relationship in all instantaneous blasts should be 1:1 to ensure equal distribution of explosives in the blast. Second, if an instantaneous blast is fired with a spacing to burden relationship of 2:1, the back wall of the blasted area will, in most cases, be “sawtoothed.”

When delays are used, particularly when there is hole-for-hole and row-for-row delay, with no two holes firing on the same period, the angle of breakage approaches the idealized ratio of 2:1. The slight addition of burden avoids the possibility of “blowout,” or violent throw from relieved burdens during the shifting of burden from one hole to another.

RULE 3: Stemming should be equal to the burden.

The purpose of stemming, it has long been assumed, is to return the borehole to its original condition as much as possible in order to reduce noise, and possibly rifling at the top portion of the hole. Stemming also serves to confine and maximize efficient use of the explosive’s energy. If the explosive detonation process takes place up the borehole, the surface of the rock above the stemming is as much a free face (assuming there is a free face) as the free face that is parallel to the boreholes. If the stemming is greater than the burden, the rock at the top of the borehole will have less cracking from reflection and refraction of compressive and tensile waves. Then stemming should equal burden, and be of such material as to return the rock close to its original condition. Drill fines, tamped into the hole are ideal.

RULE 4: Subdrill (if necessary) should be between .3 and .5 of spacing.

Some investigators state that subdrill should be equal to .3 of burden. This is true in instances where spacing and burden are equal, such as with instantaneous blasts. It will also work when there is row-for-row delay. In blasts where the delay system is both row-for-row and hole-for-hole, however, the subdrill should be determined by the largest dimension, which is the spacing. An average subdrill of .4 of spacing is best to use for planning purposes.

Reference
https://www.nps.gov/parkhistory/online_books/npsg/explosives/Chapter8.pdf
0
  • 0 0 Comments
  • 1k Views
  • 1k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Your 2026 mobile mining improvement plan starts with an honest site diagnostic
  • Lessons from Summitville: when geochemistry is underestimated
  • From Liability to Resource: What Selective Tailings Reprocessing Is Actually Proving

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • How Mobile Crushing Plants Build Flexible, Intelligent Production Lines in Latin American Mines
    • On: December 30, 2025

    How Mobile Crushing Plants Build Flexible, Intelligent Production Lines in ...

    • On: December 30, 2025

    Employee Time Tracking Apps for Flexible Work Models

  • Anti-Material Segregation Technologies Enhance Asphalt Paver Machine Performance
    • On: December 30, 2025

    Anti-Material Segregation Technologies Enhance Asphalt Paver Machine Performance

  • What to Expect from Professional EOT Crane Manufacturers in India
    • On: December 30, 2025

    What to Expect from Professional EOT Crane Manufacturers in India

  • Ready Mixed Concrete Batching Plant Applications Across Open-Pit and Underground Mining
    • On: December 30, 2025

    Ready Mixed Concrete Batching Plant Applications Across Open-Pit and Underground ...

  • WELCOME TO THE FUTURE OF MINERALS 2026
    • On: December 11, 2025

    WELCOME TO THE FUTURE OF MINERALS 2026

  • How Multi-Source Waste Treatment Boosts Aggregate Plant Competitiveness in Latin America
    • On: December 3, 2025

    How Multi-Source Waste Treatment Boosts Aggregate Plant Competitiveness in Latin ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2025 Mining Doc. All Rights Reserved