Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining DocProfessional
Added: April 30, 20252025-04-30T04:53:54-04:00 2025-04-30T04:53:54-04:00In: Mining Engineering

How can water in boreholes influence blasting results?

  • 1
  • 1

Due to poor fragmentation, poor level cut, back-break, and blasthole blowup, inefficient blasting performances brought on by the watery borehole have a detrimental effect on mine output. Additionally, they raise the dangers to the environment and public safety by producing harmful vapours, fly rock, and excessive vibration.

The incomplete explosion of the water-contaminated explosives is the primary source of the majority of the negative impacts of the watery boreholes. To put it another way, if the water is totally separated from the explosive column, which promotes a full explosion, the rate of negative consequences will be reduced (Jang et al., 2018a).

The full explosion would increase the duration of the induced explosion energy actions inside the rock mass, increase the stress oscillation caused by the water in a borehole, and create significant synergies with the favourable rock breaking conditions of the saturated rock mass, all of which would maximise rock breakage performances and minimise the negative effects of a watery borehole.

The majority of adverse effects of the water on blasting performances are due to the deterioration of the explosive. When explosives are immersed 24 hours in water, ANFO will loss 98% of Ammonium nitrate (AN) while the water-in-oil based emulsion explosives loss 0.5% AN (Ni et al., 2012). Although the degree of the water’s negative effects would vary depending on the type of explosive, it is inevitable when the water in the borehole comes into direct contact with explosives.

The length of time an explosive sleeps in a borehole and the borehole’s moisture content determine how much explosive deterioration results from water. The phenomena has the potential to significantly alter the chemical components of nearby explosives. The moistened explosive becomes desensitised and frequently fails to ignite, especially when it comes to hygroscopic explosives like ammonium nitrate fuel oil (ANFO).

Given that the adverse effects, the water in a borehole would result shorten the diameter of the detonable explosive column, decelerate the velocity of detonation (VOD), toxic fume due to the incomplete explosion, and residual explosive in a borehole in a severe condition (Jang et al., 2018b).

In a wet borehole, the VOD would be much slower than in a dry one because of the moist borehole wall and the degraded explosive along the borehole wall.

Reference

Jang, H., Handel, D., Ko, Y., Yang, H.-S., & Miedecke, J. (2018a). Effects of water deck on rock blasting performance. International Journal of Rock Mechanics and Mining Sciences, 112, 77–83. https://doi.org/10.1016/j.ijrmms.2018.09.006

Jang, H., Handel, D., Ko, Y., Yang, H.-S., & Miedecke, J. (2018b). Effects of water deck on rock blasting performance. International Journal of Rock Mechanics and Mining Sciences, 112, 77–83. https://doi.org/10.1016/j.ijrmms.2018.09.006

Ni, O., Zhang, K., Yu, Z., & Tang, S. (2012). Powdery Emulsion Explosive: A New Excellent Industrial Explosive. Journal of Energetic Materials, 30(3), 183–195. https://doi.org/10.1080/07370652.2010.550599

0
  • 0 0 Comments
  • 939 Views
  • 939 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Rock mechanics: the unsung hero of modern mines
  • Advanced simulations make mines predictable
  • 80% of fragmentation problems don’t come from explosives… they come from drilling

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Global Demand for Stationary Concrete Batching Plants in the Mining Sector
    • On: February 23, 2026

    Global Demand for Stationary Concrete Batching Plants in the Mining ...

    • On: February 23, 2026

    Mining Drone Technology: How Smart Aerial Systems Are Transforming Modern ...

  • Newmont beats profit forecast, plans $1.4 billion investment in Newcrest assets
    • On: February 20, 2026

    Newmont beats profit forecast, plans $1.4 billion investment in Newcrest ...

  • Rio Tinto reports solid 2025 results as copper growth and cost discipline drive performance
    • On: February 20, 2026

    Rio Tinto reports solid 2025 results as copper growth and ...

  • White House: no changes to Trump metals tariffs unless president announces them.
    • On: February 13, 2026

    White House: no changes to Trump metals tariffs unless president ...

  • Middlemount Mine Australia received a 7-year extension approval for coal mining until 2044.
    • On: February 13, 2026

    Middlemount Mine Australia received a 7-year extension approval for coal ...

  • Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones
    • On: February 13, 2026

    Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved