Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: May 3, 20252025-05-03T03:17:39-04:00 2025-05-03T03:17:39-04:00In: General Information

What are the challenges in Longwall mining?

  • 0
  • 0

Longwall mining, while efficient for coal extraction, faces multifaceted challenges spanning geological, operational, environmental, and safety domains.

Below are some challenges:

  1. Armoured face conveyor (AFC) Creep: This is the migration of the AFC towards the main gate or tailgate. Some factors include: direction of push, gradient, misalignment, poor face management. It is quite common. Some operational problems are binding of supports, broken equipment, loss of roof control, inability to cut out at ends. It has a small risk to people. Training and good face management are mitigation techniques.
  2. Excessive Water: Beyond normal requirements create mud, pools, free running water. Leaking pipes and hoses, strata water, inefficient water sprays, broken pumps poor water management. It is quite common. Bogging of machinery, damage to electrical equipment. Stumbling and slipping accidents, drowning. Training and good water management plan is a good mitigation plan.
  3. Horizon Control: “That which everything else must follow”.  Operator error, lack of training, blunt picks, poor drum design, poor management. Damage to AFC dog bones and drive frames, inability to advance AFC, potential for drum contacting support canopies. Small. It is quite common. Training, new technology (auto steering), cowls, good face management.
  4. Dust: Particles of matter, the result of disintegration.  Blunt picks, transfer points, poor ventilation, poor suppression. Risks to machinery is  small. Risks to people is high  through respirable dust. Respirable dust is well controlled but nuisance dust (particles you can see) are still common in most coal mines. Effective dust monitoring, well maintained equipment and effective dust suppression.
  5. Attitude: Tendency to respond positively or negatively to an idea, object, person, which influences ability to succeed. Interaction between people, management and workforce and invariably the other shift is always at fault. It is quite c  A good teamwork will greatly lead to better attitude.
  6. Stopping: The state of inactivity following an interruption. Statistically, roof falls are most likely to occur after a shutdown. Coal clearance problems, planned shutdowns, unplanned shutdowns, poor maintenance, poor mine management. Risks to machinery high. Risks to people:Low (except where a roof fall occurs). Frequency: Very Common. Remedy: Good longwall management. A longwall is at less risk if run “24/7” (Top Ten Longwall Problems, 2004)

Have you ever experienced longwall mining? What challenges did you face? Comment below!

Reference:
Top ten longwall problems. (2004, March 1). https://www.miningmonthly.com/international-coal-news/news/1295483/longwall
What are the challenges in Longwall mining?
0
  • 0 0 Comments
  • 1k Views
  • 1k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Let’s talk about Asanko Gold Mine
  • What's driving increased interest in mine tailings reprocessing as a secondary resource strategy?
  • What's the practical difference between JORC, NI 43-101, and SAMREC reporting when courting international investors?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • How is machine learning-based ore sorting research translating into commercial deployment outcomes?
    • On: August 25, 2026

    How is machine learning-based ore sorting research translating into commercial ...

  • What Materials Can Stone Crushers Process?
    • On: August 25, 2026

    What Materials Can Stone Crushers Process?

  • How Does A 12000Gs Magnetic Separator Protect A Mobile Crushing Plant's Cone Crusher?
    • On: August 25, 2026

    How Does A 12000Gs Magnetic Separator Protect A Mobile Crushing ...

  • Crusher Plant in Peru by Capacity: How to Choose the Right Production Output for Your Project
    • On: August 23, 2026

    Crusher Plant in Peru by Capacity: How to Choose the ...

  • Protected: Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing
    • On: August 19, 2026

    Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing

  • Should You Buy Mobile Crushing Plant Equipment During a Mining Downturn?
    • On: August 17, 2026

    Should You Buy Mobile Crushing Plant Equipment During a Mining ...

  • Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability
    • On: August 14, 2026

    Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved