Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocExplainer
Added: May 11, 20252025-05-11T22:26:12-04:00 2025-05-11T22:26:12-04:00In: Mining Operations

What can go wrong with a tailings dam?

  • 0
  • 0

Tailings dams, vast structures designed for the perpetual containment of hazardous mining byproducts (U.S. Environmental Protection Agency, n.d.), pose significant, centuries-long stability challenges. Failures often stem from a combination of geotechnical weaknesses like slope instability, hydrological events such as overtopping frequently exacerbated by extreme weather and seismic activity (U.S. Environmental Protection Agency, 2017).

Critically, human and systemic deficiencies are primary contributors; these include flawed design, substandard construction, operational mismanagement that may prioritize short-term economics, inadequate monitoring, and regulatory gaps, leading to largely preventable disasters (Freitas & Fernandes, 2020).

The consequences of such failures are catastrophic. Environmentally, they unleash widespread contamination of water and soil, destroying ecosystems, agricultural lands, and biodiversity (U.S. Environmental Protection Agency, 2017). Socio-economically, they result in tragic loss of human life, community displacement, destruction of livelihoods, and severe long-term public health crises (Freitas & Fernandes, 2020).

Statistically, tailings dams exhibit a markedly higher failure rate than water retention dams, a persistent issue despite known risks. An alarming trend shows an increase in failures linked to poor management and intense rainfall, highlighting growing vulnerabilities to climate change (Azam & Li, 2010).

The consensus that most failures are preventable (Freitas & Fernandes, 2020) underscores the urgent need for systemic reforms. This includes robust regulatory oversight and a fundamental shift in corporate culture to prioritize long-term safety and environmental stewardship over immediate economic gains (Jensen Hughes, 2022).

Why do some tailings dams fail, even when the risks are well known?

References:
Azam, S., & Li, Q. (2010). Tailings Dam Failures: A Review of the Last One Hundred Years. Retrieved from(https://www.researchgate.net/publication/265227636_Tailings_Dam_Failures_A_Review_of_the_Last_One_Hundred_Years)
Freitas, C. M. de, & Fernandes, M. (2020). Mining-related work accidents/disasters are not so rare, but they became normal in Brazil: the mining dam failure in Brumadinho, Minas Gerais,
Jensen Hughes. (2022, March 23). Tailings Dams: Why They Fail and What Can Be Done. Retrieved from https://www.jensenhughes.com/insights/tailings-dams-why-they-fail-and-what-can-be-done-2
U.S. Environmental Protection Agency. (n.d.). Review of Tailings Dam Failures. Retrieved from https://ofmpub.epa.gov/eims/eimscomm.getfile%3Fp_download_id%3D513583+%26cd=1%26hl=en%26ct=clnk%26gl=au
U.S. Environmental Protection Agency. (2017). Tailings Dam Failure Technical Report (Appendix K9.3.1-A, Pebble Limited Partnership’s Permit Application to Discharge Fill Material into Waters of the United States). Retrieved from https://ordspub.epa.gov/ords/eims/eimscomm.getfile?p_download_id=522970
Video rights: @elvladyman (YouTube)
0
  • 0 0 Comments
  • 942 Views
  • 942 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Before the Raise Starts: What Actually Keeps Upstream Embankments Standing
  • Choosing Tailings Management Systems: Lessons from Grasberg Mine, Indonesia
  • STEINERT and Ferbasa are leading the way in sensor-based sorting in Latin America.

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • White House: no changes to Trump metals tariffs unless president announces them.
    • On: February 13, 2026

    White House: no changes to Trump metals tariffs unless president ...

  • Middlemount Mine Australia received a 7-year extension approval for coal mining until 2044.
    • On: February 13, 2026

    Middlemount Mine Australia received a 7-year extension approval for coal ...

  • Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones
    • On: February 13, 2026

    Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones

  • Optimizing Mining Operations with High-Performance Ore Crushing Machines
    • On: February 12, 2026

    Optimizing Mining Operations with High-Performance Ore Crushing Machines

  • Designing Tailings for the Century, Not the Quarter
    • On: February 12, 2026

    Designing Tailings for the Century, Not the Quarter

  • Smart slope monitoring turns risk into opportunity
    • On: February 12, 2026

    Smart slope monitoring turns risk into opportunity

  • Reducing Water and Energy Use with Concrete Batching Plant Australia in Mining Operations
    • On: February 9, 2026

    Reducing Water and Energy Use with Concrete Batching Plant Australia ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved