Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: July 9, 20262026-07-09T05:29:57-04:00 2026-07-09T05:29:57-04:00In: Mining Operations

What are the operational criteria for declaring a highwall failure risk and implementing an emergency evacuation protocol in an open-pit mine?

  • 0
  • 0

In open-pit mining, highwall failure refers to the instability and collapse of a steep and excavated rock face. To avoid dangerous accidents, mines have emergency evacuation plans, which refer to procedures used to evacuate personnel and equipment from hazardous areas quickly. Knowledge of the exact parameters of mining operation that cause the initiation of these life-saving plans is very important in geotechnical risk management.

Highwall instability involves many different geological and environmental conditions. The process of mining affects in-situ stress, which takes some time for the rest of rock mass to attain an equilibrium (Sharon, 2020). The failure mechanisms depend greatly on structural discontinuities, higher pore pressures, and constant weathering processes (Kolapo et al., 2022). For instance, extremely dangerous plane failures are likely to happen in cases when the angle of a discontinuity is smaller than the slope angle but larger than the surface friction angle (Kolapo et al., 2022).

Highwall failure probability is based on ongoing real-time monitoring of the deformation process by the use of sophisticated technology known as Slope Stability Radar (SSR). The first condition in operation is that there must be an increasing displacement rate in the rock face. In geotechnical engineering, an inverse velocity versus time graph is used, and when this curve shows a linear relationship that intersects with the time axis, it indicates impending collapse and determines the predicted failure timeline (Cabrejo, 2013).

The time windows used determine how prediction warnings are set up. When using large time windows such as 24 hours, the deformation process can be detected earlier, giving an alarm in the process (Cabrejo, 2013). However, using smaller time windows such as one hour provides the most recent state of deformation and provides highly accurate predictions of the timing of failure and confirmation of clearing the pit (Cabrejo, 2013).

If the pre-existing thresholds of inverse velocity are exceeded, the emergency evacuation process is set into motion. The forecasted time when the structure would collapse provides a time limit for all the evacuations (Cabrejo, 2013). The immediate steps would involve sounding automatic sirens, stopping the blasting and loading process and leading the staff to safe areas till the risky sector of the pit is cleared off.

To sum up, the effective handling of slope risks requires an integration of both geotechnical monitoring and operational preparedness. Even though some rockfall events may occur with little or no warnings at all, the well-disciplined monitoring system gives enough information for predicting the occurrence of big disasters (Sharon, 2020).

References

Cabrejo, A. (2013). Analysis of failures in open pit mines and consideration of the uncertainty when predicting collapses. Proceedings of the 2013 International Symposium on Slope Stability in Open Pit Mining and Civil Engineering, 483–497. https://doi.org/10.36487/acg_rep/1308_31_cabrejo

Kolapo, P., Oniyide, G. O., Said, K. O., Lawal, A. I., Onifade, M., & Munemo, P. (2022). An overview of slope failure in mining operations. Mining, 2(2), 350–384. https://doi.org/10.3390/mining2020019

Sharon, R. (2020). Slope performance monitoring: system design, implementation and quality assurance. Proceedings of the 2020 International Symposium on Slope Stability in Open Pit Mining and Civil Engineering, 17–38. https://doi.org/10.36487/acg_repo/2025_0.02

0
  • 0 0 Comments
  • 417 Views
  • 417 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the correct approach to managing stockpile segregation to prevent grade dilution over time?
  • How to optimize blast fragmentation to reduce downstream crusher bottlenecks without increasing vibration complaints?
  • Lase Bulk Solutions - from Pit to Port

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Crusher Plant in Peru by Capacity: How to Choose the Right Production Output for Your Project
    • On: August 23, 2026

    Crusher Plant in Peru by Capacity: How to Choose the ...

  • Protected: Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing
    • On: August 19, 2026

    Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing

  • Should You Buy Mobile Crushing Plant Equipment During a Mining Downturn?
    • On: August 17, 2026

    Should You Buy Mobile Crushing Plant Equipment During a Mining ...

  • Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability
    • On: August 14, 2026

    Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability

  • Mobile Jaw Crusher for Sale for Hard Rock Mining: How to Configure Equipment for Demanding Crushing Conditions
    • On: August 12, 2026

    Mobile Jaw Crusher for Sale for Hard Rock Mining: How ...

  • From Raw Stone to Construction Aggregate: The Complete Processing Process
    • On: August 12, 2026

    From Raw Stone to Construction Aggregate: The Complete Processing Process

  • Using a Ready Mix Concrete Batching Plant for Mining Tunnel Lining and Shaft Construction
    • On: August 11, 2026

    Using a Ready Mix Concrete Batching Plant for Mining Tunnel ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved