Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocTeacher
Added: November 26, 20262026-11-26T04:28:11-05:00 2026-11-26T04:28:11-05:00In: Mobile Plant Equipment

What factors determine the optimum fleet size for a haulage circuit?

  • 0
  • 0

Shovel-truck systems represent the most prevalent method for transporting raw materials in open-pit mining, yet they impose substantial financial demands. Haulage operations alone account for 50% to 60% of total mining operating costs and can reach 60% to 75% of raw material expenses in deep open pits. Consequently, fleet sizing constitutes a critical balancing act between equipment productivity and capital expenditure. Additional trucks increase excavator utilization, but individual truck productivity declines as road congestion and queuing intensify. Mine planners must therefore identify an optimal fleet size that satisfies production targets while minimizing both idle machinery and unnecessary capital waste.

Fleet sizing begins with the required shift tonnage or volume and the scheduled shift duration. Planners must determine each truck’s actual load per trip by adjusting its rated payload with an empirical fill factor. Mixed fleets require separate modeling for each vehicle class, because assuming a uniform single-class fleet can underestimate maximum production capacity by up to 14% when two truck classes operate together. Furthermore, scheduled hours must be converted into true working hours without double-counting delays. Physical availability removes mechanical downtime, use of availability deducts standby periods such as shift changes and breaks, and operating efficiency accounts for running delays like refuelling.

Total haulage cycle time encompasses spotting, queuing at loaders and dumps, loading, loaded travel, dumping, and empty return. Rather than relying on idealized single-cycle figures, planners should use multi-shift averages recorded by fleet management systems. Travel durations shift continuously as pit depth increases and faces advance, driven primarily by haul road geometry and surface quality. Uphill speeds decline with steeper grades and heavier payloads, with deceleration accelerating sharply above a 4% grade. Soft or poorly maintained surfaces can elevate rolling resistance from 1.2% to 20%. Inadequate road width, sharp curves, busy intersections, vehicle condition, and operator fatigue further extend cycle times.

Effective circuit design requires physical compatibility between loaders and trucks, including appropriate bench height, dump clearance, and a target of three to six bucket passes. A match factor below 1.0 leaves loaders waiting, whereas values above 1.0 generate truck queues without adding tonnage. Because trucks bunch on ramps, static averages fail to capture stochastic arrival variability and shift-change effects. Discrete-event simulation addresses this limitation; one case study showed that 13 trucks could meet a 15,000 BCM daily target instead of 17, saving $180 per hour. Long-term sizing also weighs capital expenditure against maintenance and production-loss costs, often justifying strategic spare capacity.

Optimum haulage fleet size cannot be established through a static, one-time arithmetic formula. Instead, mine planners must integrate shift production targets and equipment availability with haul road physics, loader-truck compatibility, stochastic queuing behavior, and life cycle economics. Conventional cycle-time and match-factor equations provide a useful baseline estimate for initial planning. Before committing capital or parking existing vehicles, however, operations should validate fleet configurations against historical dispatch data using queuing models or discrete-event simulation. As pit geometry evolves and haul distances lengthen, continuous re-evaluation of truck counts and dispatching strategies remains essential for sustained operational efficiency.

0
  • 0 0 Comments
  • 21 Views
  • 21 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How can haul road design minimize tire wear and improve truck efficiency?
  • How can haul road dust control improve visibility and equipment reliability?
  • How does rolling resistance influence haul truck fuel consumption and fleet productivity?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Sponsored Ads

aalan
Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved