Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining Doc
Added: March 25, 20232023-03-25T16:43:27-04:00 2023-03-25T16:43:27-04:00In: Mining Case Studies

How does the ventilation and refrigeration design look like for Australia’s Deepest and Hottest Underground Operation ?

  • 1
  • 1

The Enterprise mine (EM) is located at Mount Isa and is wholly owned by Mount Isa Mines Limited (MIM). This high grade copper mine extends from about 1000 m below surface to almost 2000 m below surface. A recent $400 million upgrade has taken the operation from a production rate of 1.3 Mtpa to a capacity of 3.5 Mtpa. The effects of high surface ambient temperatures in summer, combined with the depth of the mine and high virgin rock temperatures results in heat stress in the working place that, without intervention, would exceed the levels that human physiology can withstand. It would also result in significant decreases in productivity and high accident rates even where work is possible. Moreover, with a very hot and deep mine, the needs of “egress” and entrapment of workers during a mine emergency must be carefully considered.
Enterprise Mine has taken a “systems approach” to the issue of working productively, healthily and safely in heat. This involves setting limits of thermal stress for workers, understanding productivity decrements when working in heat, establishing productive and healthy environmental targets, developing engineering solutions to meet these targets, creating a well-educated workforce with respect to working in heat and then developing health protocols to ensure workers’ health is protected.
Refrigeration must be added to the mine to provide acceptable and productive conditions underground. By the time the mine is commissioned in 2000, Enterprise mine will have an installed refrigeration capacity of in excess of 40 MW(R).
The ventilation engineering principles proven over many years at the other Isa underground mines are tailored to “flooding” the mine with air to remove the heat, which is the main contaminant. This principle will not work at the Enterprise mine, for reasons discussed below. With the underlying ventilation principle no longer satisfactory, a complete review of the entire ventilation principles and engineering solutions was required for the Enterprise mine.

Follow the link to download the article.

Ventilation-and-refrigeration-design

How does the ventilation and refrigeration design look like for Australia’s Deepest and Hottest Underground Operation ?
0
  • 0 0 Comments
  • 633 Views
  • 633 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Decision Architecture in African Mining: Building High Reliability, High Visibility Decision Systems for Sustainable Performance
  • African Mining 2030–2040 — Strategic Foresight, Geopolitics & the Future Operating Model
  • Exploration Drilling Excellence in Africa: An Executive Case Study

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Optimizing Mining Operations with High-Performance Ore Crushing Machines
    • On: February 12, 2026

    Optimizing Mining Operations with High-Performance Ore Crushing Machines

  • Designing Tailings for the Century, Not the Quarter
    • On: February 12, 2026

    Designing Tailings for the Century, Not the Quarter

  • Smart slope monitoring turns risk into opportunity
    • On: February 12, 2026

    Smart slope monitoring turns risk into opportunity

  • Reducing Water and Energy Use with Concrete Batching Plant Australia in Mining Operations
    • On: February 9, 2026

    Reducing Water and Energy Use with Concrete Batching Plant Australia ...

  • Analysis of Key Safety Management Points for Mobile Crushing Stations at Latin American Construction Sites
    • On: February 9, 2026

    Analysis of Key Safety Management Points for Mobile Crushing Stations ...

  • Learning Different Types of Crusher Machine: Spring Cone Crusher
    • On: February 9, 2026

    Learning Different Types of Crusher Machine: Spring Cone Crusher

    • On: February 9, 2026

    Safety Management System: What It Is and Why Your Business ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved