Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: October 30, 20252025-10-30T06:11:57-04:00 2025-10-30T06:11:57-04:00In: Mining Engineering

How is equipment fleet size and selection determined for open-pit mining?

  • 0
  • 0

Selecting and sizing an equipment fleet for an open-pit mining operation is a critical process that influences both operational efficiency and overall project economics. The fleet typically includes loading and hauling equipment, the two primary components responsible for moving ore and waste within the mine. Determining the right type, size, and number of units in this fleet requires careful consideration of several technical and economic factors.

Production requirements drive selection

The foundation of fleet selection is the mine’s production rate, both daily and over the mine’s lifespan. The total ore and waste tonnage to be extracted, along with the desired throughput, set the baseline for equipment capacity needs. Larger production targets require correspondingly larger or more numerous pieces of equipment. For instance, daily tonnages below roughly 60,000 tons may only require three drills, while higher volumes necessitate more to ensure continuous operation without bottlenecks.

Equipment type and compatibility

Open-pit mines commonly utilize hydraulic shovels or excavators coupled with large haul trucks. Other equipment types, like draglines or bucket wheel excavators, are used in some scenarios, often depending on the deposit’s geology and mining method. The compatibility between loaders and trucks is paramount because the loader must be capable of filling the truck efficiently. This compatibility extends to operational heights, bucket size, and loading cycle time.

Size determination using cycle time and capacity

Equipment size is quantitatively matched based on expected capacity and productivity. For example, truck size is often chosen to be roughly nine times the loader’s dipper bucket capacity in tons, ensuring trucks are neither under- nor over-utilized, which would otherwise increase costs or decrease productivity. The total number of trucks needed is calculated by considering the trucks’ payloads, cycle times (which include loading, hauling, dumping, and returning), and allowances for maintenance downtime.

Cost and operational flexibility considerations

Hauling costs typically outweigh loading costs, making truck selection particularly important. Larger trucks reduce the number of trips but require compatible loading equipment and adequate road infrastructure to operate safely. Conversely, smaller trucks offer greater flexibility in maneuvering and can be advantageous in certain mine designs or during phases with lower production rates. Reliability and operational flexibility are crucial to prevent downtime that can significantly impact costs.

Optimization and planning tools

Modern mine planning incorporates mathematical models and frameworks to optimize fleet composition. These models balance capital expenditure (CAPEX) and operational expenditure (OPEX), assess productivity, and consider factors like equipment availability and repair schedules. Tools such as mixed-integer non-linear programming (MINLP) models and stochastic simulations help derive the optimal fleet size that meets production targets at minimal cost.

Summary

In conclusion, determining the equipment fleet size and selection in open-pit mining is a multifaceted process driven primarily by production requirements. It involves selecting compatible equipment types and sizes, balancing cost and operational flexibility, and applying optimization techniques to ensure productivity and cost-efficiency. This strategic decision shapes the mine’s overall performance, underscoring the need for detailed technical and economic analysis during mine design and planning phases.

0
  • 0 0 Comments
  • 940 Views
  • 940 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Why do safe blasts mean happier communities?
  • Every Misfire Is a Lesson, not a Failure
  • Blasting is still more art than science

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Reducing Water and Energy Use with Concrete Batching Plant Australia in Mining Operations
    • On: February 9, 2026

    Reducing Water and Energy Use with Concrete Batching Plant Australia ...

  • Analysis of Key Safety Management Points for Mobile Crushing Stations at Latin American Construction Sites
    • On: February 9, 2026

    Analysis of Key Safety Management Points for Mobile Crushing Stations ...

  • Learning Different Types of Crusher Machine: Spring Cone Crusher
    • On: February 9, 2026

    Learning Different Types of Crusher Machine: Spring Cone Crusher

    • On: February 9, 2026

    Safety Management System: What It Is and Why Your Business ...

  • Australia’s iron ore hub of Port Hedland was cleared due to a cyclone threat.
    • On: February 6, 2026

    Australia’s iron ore hub of Port Hedland was cleared due ...

  • Rio Tinto and Groupe CH introduce "Forged here," a celebration of the towns and individuals that produce aluminium in Quebec.
    • On: February 6, 2026

    Rio Tinto and Groupe CH introduce "Forged here," a celebration ...

  • US provides rare earths miner Serra Verde with $565 million financing, stake option
    • On: February 5, 2026

    US provides rare earths miner Serra Verde with $565 million ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved