Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining DocExplainer
Added: August 19, 20252025-08-19T11:07:03-04:00 2025-08-19T11:07:03-04:00In: Geology

What should be considered when going from Open pit to Underground mining?

  • 1
  • 1

The transition for Open Pit to Underground mining hinges on balancing economic benefits with engineering limits.

The optimal depth is reached when the cost of deepening the pit by another meter matches or exceeds the cost of underground extraction for the same ore volume.

So, you can start planning it from 5 to 15 years before the pit reaches its limit. If you identify the transition point earlier, you can ensure things like proper infrastructure, stable slopes, and maximum reserves recovery.

Ultimately, choosing the right transition depth keeps the mine running smoothly and maximizes the deposit value throughout its life cycle.

One of the biggest factors shaping the choice of underground mining method once the open pit phase is complete is geomechanical conditions.

Key factors include:
  • rock strength;
  • fracturing instead of stress;
  • pit slope stability;
  • host rock properties;

Rock quality is evaluated using systems like RMR, Q, GSI or strength criteria such as Hoek-Brown criterion which helps create limit state diagrams for various scenarios.

For example, the Hoek-Brown criterion uses rock strength and structural data to define ultimate rock pressure aiding in assessing pit slope stability and predicting roof collapse.

In strong uniforms rocks like intrusive types with UCS above 150 to 200 MPa, pit slopes can be steeper around 45 to 60⁰ allowing deeper pits.

In weaker rocks with UCS below 50 MPa, slopes must be gentler under 40% restricting pit depth.

Most economically design pits have slope angles already maximized within geomechanical limits. So deepening further risks instability or requires impractical pit expansion.

Different underground mining systems place different demand on the strength of the rock mass. In strong rocks, with a low fracturing and high UCS like over 100 MPa, large stable chambers work well, making a room and pillar or large volume blast method such as sublevel stoping ideal.

For moderately strong or mixed rock masses prone to collapse, the backfilled methods like cut and fill or control caving such as sublevel caving are better where the hanging wall collapses after extraction.

For example, sublevel caving is used in Sweden and Ukraine’s iron deposits because the magnetite is so strong with UCS around 200 MPa. The surrounding weaker host rock naturally fills the void after blasting.

Block caving was once thought suitable only for weaker rocks with UCS from 6 to 60 MPa that naturally break under their own weight. However, advancements over the passed 20 years like hydraulic fracturing or preconditioning blasting have expanded block caving to strong rocks.

For example, in project like Palabora in South Africa and El Teniente in Chile, block caving has successfully been implemented in rock masses with UCS value of 140, 170 MPa even up to around 300 MPa in Palabora.

Author: K-MINE
Image rights: Mining Engineering Education⚒ (Instagram)
What should be considered when going from Open pit to Underground mining?
0
  • 0 0 Comments
  • 2k Views
  • 2k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the correct approach to estimating geological uncertainty for a maiden JORC Inferred resource?
  • What structural controls should you prioritize when vectoring toward bonanza-grade zones in narrow-vein systems?
  • How to validate drill hole database integrity before committing to a resource update?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Protected: Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing
    • On: August 19, 2026

    Greener Mining: How Non-Nuclear Technology Is Transforming Mineral Processing

  • Should You Buy Mobile Crushing Plant Equipment During a Mining Downturn?
    • On: August 17, 2026

    Should You Buy Mobile Crushing Plant Equipment During a Mining ...

  • Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability
    • On: August 14, 2026

    Beyond Stockrooms: How Intelligent Inventory & Procurement Drive Mining Profitability

  • Mobile Jaw Crusher for Sale for Hard Rock Mining: How to Configure Equipment for Demanding Crushing Conditions
    • On: August 12, 2026

    Mobile Jaw Crusher for Sale for Hard Rock Mining: How ...

  • From Raw Stone to Construction Aggregate: The Complete Processing Process
    • On: August 12, 2026

    From Raw Stone to Construction Aggregate: The Complete Processing Process

  • Using a Ready Mix Concrete Batching Plant for Mining Tunnel Lining and Shaft Construction
    • On: August 11, 2026

    Using a Ready Mix Concrete Batching Plant for Mining Tunnel ...

  • High-Altitude Motor and Power Selection for Andean Mining Mills
    • On: August 11, 2026

    High-Altitude Motor and Power Selection for Andean Mining Mills

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved