Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: January 27, 20262026-01-27T08:26:09-05:00 2026-01-27T08:26:09-05:00In: General Information

How can mining sequence adjustments extend the life of an open-pit operation?

  • 0
  • 0

Mining sequence adjustments extend open-pit life by strategically balancing ore extraction against shifting waste stripping requirements. By implementing dynamic sequencing, operators prioritize high-margin ore during market volatility, ensuring sufficient cash flow to sustain long-term stripping (Hustrulid et al., 2013). This flexibility prevents premature closures by adapting to both economic cycles and unforeseen geological challenges.

Strategic “nested pit” designs allow for the deferral of high-ratio waste removal to later years when operational efficiencies are higher. By optimizing the pushback sequence, mines maximize early Net Present Value (NPV) while maintaining access to deeper reserves that might otherwise be deemed uneconomic (Read & Stacey, 2009). This phased approach ensures the operation remains resilient and protects the “tail” of the mine life.

Integrating real-time geotechnical data allows for rapid sequence changes to bypass unstable sectors without halting total production. These adjustments maintain a “steady state” of mill feed while remediation work is performed on high-risk walls (Sullivan, 2007). Ultimately, a flexible mining sequence transforms the mine plan into a living strategy that maximizes resource recovery and operational longevity.

When the market dips or a pit wall flinches, is your mine plan a rigid cage or a flexible shield? Sequencing isn’t just about moving dirt; it’s about buying time. Are you mining for this quarter’s bonus, or for the next decade of operation?

References:
  • Hustrulid, W., et al. (2013). Open Pit Mine Planning and Design.
  • Read, J., & Stacey, P. (2009). Guidelines for Open Pit Slope Design.
  • Sullivan, T. (2007). Geotechnical Considerations in Open Pit Design.
How can mining sequence adjustments extend the life of an open-pit operation?
0
  • 0 0 Comments
  • 81 Views
  • 31 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How do fluctuations in strip ratio impact long-term project NPV?
  • How does cyclone optimization impact final concentrate quality?
  • How can condition-based monitoring extend the life of critical crushing assets?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Westray Is Not History — It’s a Leadership Lesson for Every Mine Today
    • On: January 28, 2026

    Westray Is Not History — It’s a Leadership Lesson for ...

  • What Is Critical Risk Management?
    • On: January 27, 2026

    What Is Critical Risk Management?

  • Analyze Thousands of Blocks in Seconds – Welcome to the Future of Rock Slope Engineering
    • On: January 27, 2026

    Analyze Thousands of Blocks in Seconds - Welcome to the ...

  • Using Mobile Concrete Batching Plants for Mine Roads and Processing Facilities
    • On: January 26, 2026

    Using Mobile Concrete Batching Plants for Mine Roads and Processing ...

  • Sand Making Machines in the Mining Industry: Efficiency and Productivity Insights
    • On: January 26, 2026

    Sand Making Machines in the Mining Industry: Efficiency and Productivity ...

    • On: January 26, 2026

    What 300 TPH Stone Crusher Plant for River Stone with ...

  • Resolute Mining announced a $190 million investment for 2026 to fast-track the Doropo gold project in Côte d’Ivoire.
    • On: January 23, 2026

    Resolute Mining announced a $190 million investment for 2026 to ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved