Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: March 24, 20262026-03-24T07:55:38-04:00 2026-03-24T07:55:38-04:00In: General Information

The Kışladağ gold project: a brief description

  • 0
  • 0

Located in western Türkiye’s Usak Province, roughly 40 kilometers southwest of the city of Uşak, Kışladağ ranks among the country’s largest gold mining operations. The project is wholly owned and operated by Eldorado Gold Corporation, a Canadian mining company with a strong regional presence. It serves as a cornerstone asset within Eldorado’s portfolio, benefiting from well-established infrastructure and longstanding ties to local communities. Together, these factors position the mine as a key contributor to Türkiye’s gold production landscape.

Mining is carried out using a conventional open-pit method, with ore processed through a large-scale heap leach facility. The operation features a three-stage crushing circuit that feeds into an ADR plant where gold is ultimately recovered from solution. A major Phase IV expansion completed in 2016 significantly boosted crushing capacity, while further upgrades, including new agglomeration drums and a larger secondary crusher, are scheduled for 2026 and 2027. These ongoing investments reflect a sustained commitment to modernizing the site and improving processing efficiency.

Kışladağ is a gold porphyry deposit that formed beneath a Miocene volcanic complex, with mineralization hosted in multiple phases of intrusive latite rock. Gold occurs primarily within quartz-pyrite stockwork veins and disseminations, and an oxidation zone extends from surface down to depths of 80 meters. The deposit is characterized by low-grade, bulk-tonnage mineralization, averaging roughly 0.66 grams of gold per tonne across a substantial volume. Proven and probable reserves stand at approximately 535 million tonnes, underpinning the mine’s long-term operational outlook.

In 2025, the mine delivered 168,701 ounces of gold, a modest decrease from the 174,080 ounces produced the previous year. The average processed grade during the year came in at 0.73 grams per tonne, consistent with the deposit’s low-grade nature. Despite the slight decline in output, the operation continued to perform reliably, underscoring the effectiveness of its heap leach processing approach. Steady production levels of this magnitude reaffirm Kışladağ’s role as a consistent and valuable asset within Eldorado’s broader portfolio.

Production for 2026 is projected between 105,000 and 130,000 ounces, reflecting planned waste stripping and variations in ore grade. To extend the mine life through 2038, management is advancing a significant capital program focused on processing infrastructure. Key initiatives include installing a larger secondary crusher in late 2026 and adding two large agglomeration drums in 2027 to enhance throughput and recovery. Meanwhile, a geometallurgical study underway through the first half of 2026 aims to refine processing strategies for future phases of mining.

The Kışladağ gold project: a brief description
0
  • 0 0 Comments
  • 654 Views
  • 654 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How do you manage scaling and fouling in heap leach solution management systems?
  • Multispectral Drone Mapping: Revolutionizing Terrain Analysis with UAV Technology
  • North Mara mine: a cornerstone of Tanzania’s gold mining industry

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Portable Jaw Crusher Plant for Crushing Hard Rock Materials in Remote Mining Locations
    • On: May 8, 2026

    Portable Jaw Crusher Plant for Crushing Hard Rock Materials in ...

  • Terafil Technologies: Redefining Dust Control in Modern Mining Operations
    • On: May 7, 2026

    Terafil Technologies: Redefining Dust Control in Modern Mining Operations

  • Mastering On-Site Processing: A Strategic Guide to the Mobile Crushing Plant
    • On: April 28, 2026

    Mastering On-Site Processing: A Strategic Guide to the Mobile Crushing ...

  • From One Truck to Thousands: The Global Rise of Autonomous Mining
    • On: April 28, 2026

    From One Truck to Thousands: The Global Rise of Autonomous ...

  • Powering Remote Construction: A Guide to the Diesel Concrete Mixer
    • On: April 24, 2026

    Powering Remote Construction: A Guide to the Diesel Concrete Mixer

  • Different Types of Batching Plant Supporting Large-Scale Mining Infrastructure Projects
    • On: April 24, 2026

    Different Types of Batching Plant Supporting Large-Scale Mining Infrastructure Projects

  • Maximizing On-Site Efficiency with the Right Mobile Crusher Machine
    • On: April 21, 2026

    Maximizing On-Site Efficiency with the Right Mobile Crusher Machine

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved