Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocPundit
Added: June 2, 20262026-06-02T05:09:23-04:00 2026-06-02T05:09:23-04:00In: Fixed Plant

How do you design a SAG mill circuit for a hard, competent ore with a Bond Work Index above 18 kWh/t?

  • 0
  • 0

The SAG (Semi-Autogenous Grinding) mill is an extensive tumbling mill, which employs some portion of steel balls (usually 2-22% volumetric filling) alongside the ore as grinding media, whereas Bond Work Index (Wi) represents hardness by the amount of energy (kWh/t) consumed for reducing the size of material from infinite to 80% passing 100 µm. In case of hard and competent ores (Wi > 18 kWh/t), due to inherent resistance of such ore against breakage, the accumulation of “critical size” pebbles (13-75 mm) occurs, hindering productivity unless dealt with.

In case of Wi > 18 kWh/t, a better choice would be to adopt the SABC circuit (SAG mill + ball mill + pebble crusher) compared to a single stage SAG circuit. The need for employing pebble crushing in this case arises because of its ability to deal with critical size accumulation, otherwise a major hindrance to the efficiency of the SAG mill.

Hardness testing must be done accurately: SAG Design hardness testing (JK Axb, SMC testing) must be performed with specific energy determined from F80 = 152 mm to T80 = 1.7 mm, and Bond Ball Work Index testing conducted for SAG-milled ore. If Wi is greater than 12 kWh/t, then dry locked-cycle tests are suitable, and pilot-plant testing on 50-100 t of ore may also be required to determine accurate SAG sizing.

The size of the SAG mill must be based on unit power × desired output. For hard ores, the SAG mill requires a power of 15-25 MW using gearless drives (wrap-around motors) when the diameter of the mill is equal to or exceeds 11.6 m. Sizing of the SAG mill must consider the ratio of D to L ≥2, and ball charge volumetric filling is usually around 10% but may go up to 15% for hard ores.

In case there is a pebble crusher, use vibrating screens instead of trommel screens for SAG discharge classification since screens have high efficiency and high pebble recovery rate. The pebble crushing machine should accept feed size range of 13 – 75 mm, have metal handling system (metal detector + bypass), have storage capacity (bin or stockpile), and send crushed pebbles back into SAG feed or back directly into the ball mill circuits to relieve the SAG mill.

Pebble crushing machines are to be chosen with open grate and large aperture design in order to fully utilize the pebble crushing machine circuit and maximize the capacity of mills. Optimal ratio between shell lifters spacing and height is 2.5:1 – 5.0:1. Work the machine at 75 – 77% critical speed; for extra hard ores, higher speed (up to 77% CS) and higher steel charge (15%) may be necessary. Control mill density and load automatically.

As SAG mills are to shut down the entire concentrator during outages, it is important to design the circuit in such a way that downtime due to relining is kept to a minimum by using large-sized liners. Abrasive ores are tough on liners, and high alloy steel liners can be considered for them. There should be provision for a maintenance bypass on the pebble crusher, and consideration should be taken for any possible future retrofits on the machine.

0
  • 0 0 Comments
  • 913 Views
  • 913 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What are the key indicators that a thickener is approaching a rake torque overload condition?
  • What's the real-world difference in energy efficiency between HPGR and conventional ball milling for a hard, abrasive ore?
  • How to size a conveyor transfer chute to eliminate spillage and dust generation at high tonnage?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Sponsored Ads

aalan
  • Recent
  • How to Calculate Aggregate Production from a Stone Crushing Plant?
    • On: September 24, 2026

    How to Calculate Aggregate Production from a Stone Crushing Plant?

  • What does current research show about autonomous drilling rig performance in adverse ground conditions?
    • On: September 24, 2026

    What does current research show about autonomous drilling rig performance ...

  • Stone Crusher Machine in Chile for Mine Road Construction: Producing Aggregate from Local Rock
    • On: September 23, 2026

    Stone Crusher Machine in Chile for Mine Road Construction: Producing ...

  • Mining Job Costing: How ERP Helps Control Project Costs from Budget to Execution
    • On: September 23, 2026

    Mining Job Costing: How ERP Helps Control Project Costs from ...

  • Legal Validity of OTR Tire Supply Contracts: How Technical Appendices Protect the Interests of Mining Enterprises
    • On: September 21, 2026

    Legal Validity of OTR Tire Supply Contracts: How Technical Appendices ...

  • Mobile Crusher for Sale Philippines for Producing Road Base and Construction Aggregates
    • On: September 18, 2026

    Mobile Crusher for Sale Philippines for Producing Road Base and ...

  • Customs Clearance and Logistics Practices for Imported Crusher to Chile
    • On: September 18, 2026

    Customs Clearance and Logistics Practices for Imported Crusher to Chile

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved