Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: August 12, 20262026-08-12T04:19:31-04:00 2026-08-12T04:19:31-04:00In: Mining Engineering

What's the correct approach to sequencing a pushback to maximize NPV without starving mill feed?

  • 0
  • 0

In open pit mining, three important considerations guide the success of such ventures, and these include pushbacks, Net Present Value (NPV), and mill feed. A pushback refers to an adjacent area of material scheduled to be removed to reach the final pit limits. NPV stands for the discounting of cash flows in the future as the main criterion for project valuation, whereas mill feed refers to the continuous supply of ore to the processing mill.

The major problem in sequence scheduling involves balancing between quick extraction of the ore to optimize the NPV on one side and providing a steady flow of mill feed on the other. Optimizing the NPV will require the postponement of the waste stripping in order to get valuable ore earlier. But doing so may lead to the loss of valuable future time because of the large stripping of the waste.

In general, sequences were obtained through deterministic algorithms, concentrating solely on geometric growth. Standard methods often result in inability to keep mill feed since they lack consideration of geological heterogeneity and processing limits. As a consequence of neglecting these limitations at the design stage, sequences require highly variable extraction rates that make it necessary to modify cut-off grades or stop processing, which drastically reduces expected NPV (Consuegra & Dimitrakopoulos, 2010).

The right way to deal with this problem involves algorithmic integration that optimizes sequencing, scheduling, and stockpiling at the same time. Instead of using already known nested pits, current approaches employ integer programming to create schedules according to processing limitations. With regard to the use of the milling capabilities as hard constraints, designers provide the precise schedule for waste stripping that exposes the needed amount of ore (Agosti et al., 2021).

Moreover, to absolutely ensure that there is no starving, sequencing should use stochastic programming to cope with uncertainties in grades. Using one deterministic program would mean that any drop in grade will interrupt the feed. Multi-stage approaches in dealing with uncertainty will help planners construct schedules to obtain maximum NPV in different simulations (Jelvez et al., 2023). The approach ensures enough reserves are left available to offset geological impacts (Goodfellow & Dimitrakopoulos, 2013).

In summary, sequencing a push back to get maximum NPV without starving the mill calls for abandoning geometric sequencing and adopting more flexible approaches. Stockpiling flows along with stochastic simulation can be used together with mathematical models to ensure that an ongoing stream of ores is secured.

References

Agosti, A., Utili, S., Gregory, D., Lapworth, A., Samardzic, J., & Prawasono, A. (2021). Design of an open-pit gold mine by optimal pitwall profiles. CIM Journal, 12(3), 149–168. https://doi.org/10.1080/19236026.2021.1979382

Consuegra, F. R. A., & Dimitrakopoulos, R. (2010). Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons. Mining Technology, 119(2), 88–101. https://doi.org/10.1179/037178410×12780655704761

Goodfellow, R., & Dimitrakopoulos, R. (2013). Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines. Mining Technology, 122(2), 67–77. https://doi.org/10.1179/147490013×13639459465736

Jelvez, E., Ortiz, J., Varela, N. M., Askari-Nasab, H., & Nelis, G. (2023). A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty. Mathematics, 11(18), 3907. https://doi.org/10.3390/math11183907

What's the correct approach to sequencing a pushback to maximize NPV without starving mill feed?
0
  • 0 0 Comments
  • 299 Views
  • 299 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the practical approach to selecting cable bolt versus friction bolt support in weak, fractured ground?
  • What's the practical approach to managing gas emissions during longwall retreat in a gassy seam?
  • What's the practical method for determining in-situ stress orientation before designing a deep underground excavation?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalanaalan

Sidebar

Sponsored Ads

aalan

Sponsored Ads

aalan

Sponsored Ads

aalan
Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved