A mine plan drawn up six months ago describes a pit that no longer exists. Benches have advanced, haul roads have shifted, stockpiles have grown and moved. The design model remains fixed, but the operation it describes does not. This gap between planned and actual conditions is not a flaw in planning practice. It is […]