Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: October 22, 20242024-10-22T06:19:05-04:00 2024-10-22T06:19:05-04:00In: Mining Operations

Highland Valley Copper Mine Overview

  • 0
  • 0
Introduction

Highland Valley Copper Mine, located near Logan Lake in British Columbia, Canada, is the largest open-pit copper mine in the country. It is situated approximately 17 kilometers west of Logan Lake and about 75 kilometers southwest of Kamloops, with coordinates at 50°29’12” N latitude and 121°2’43” W longitude.

Geology

The mine primarily exploits a low-grade copper-molybdenum porphyry deposit within the Late Triassic to Early Jurassic Guichon Creek batholith. This geological formation is characterized by granitic host rocks and contains minerals such as chalcopyrite, bornite, and molybdenite, which are dispersed throughout the ore.

 The mineralization occurs mainly as disseminations in quartz veinlets and is associated with alteration zones that include phyllic (bornite) and potassic (chalcopyrite) types. The deposit features various structural elements including faults and fractures that influence mineral distribution.

Production Data (2020-2024)

Highland Valley Copper has seen significant production levels over the years, primarily managed by Teck Resources Limited since 2020. The annual copper production capacity has been reported between 115,000 to 120,000 tonnes. Specific production figures from 2020 to 2024 are as follows:

  • 2020: Approximately 115,000 tonnes of copper produced.
  • 2021: Production remained stable at around 120,000 tonnes.
  • 2022: Continued production at similar levels, maintaining around 115,000 tonnes.
  • 2023: Estimated production was again in the range of 115,000 to 120,000 tonnes.
  • 2024: Projections suggest stable production levels similar to previous years.

The mine’s reserves have been reported to include approximately 761 million tonnes of ore with an average grade of 0.408% copper and 0.0072% molybdenum, indicating a robust resource base for ongoing operations.

Conclusion

Highland Valley Copper Mine plays a crucial role in Canada’s mining sector due to its substantial copper output and extensive geological resources. Its strategic location and rich mineral deposits ensure its continued significance in the global copper market.

0
  • 0 0 Comments
  • 2k Views
  • 2k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the practical method for optimizing ventilation-on-demand systems without compromising air quality compliance?
  • How Better Frontline Communication Can Improve Mining Operations
  • What's the practical method for optimizing drill and blast patterns against downstream crusher throughput targets?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalanaalan

Sidebar

Sponsored Ads

aalan

Sponsored Ads

aalan

Sponsored Ads

aalan
Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved