Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 2
  • 2
Mining DocEnlightened
Added: October 11, 20232023-10-11T20:21:04-04:00 2023-10-11T20:21:04-04:00In: Mining Engineering

How to improve design thinking skills in Drill and Blast?

  • 2
  • 2

When it comes to drill and blast designs in mining, every design parameter used is crucial to obtain the best result after the blast. The question commonly asked is, where to start?

Rule of thumb, experience, technology, learnings, and previous results are all factors contributing to a successful blast. World Blasting Innovators is a community where professionals come together to improve their design thinking skills to optimize Drill and Blast designs to achieve great results.

The good news is that there are rules of thumb that can be used as a first estimate in the absence of any better data.

✔ Blast hole diameter in mm ≤ 15 x Bench height (BH) in metres
✔ Bench height (BH) in metres ≥ (Blast hole diameter (D) in mm)/15
✔ Burden (B) = (25 to 40) x (D)
✔ Spacing (S) = 1.15 x B (This gives an equilateral pattern)
✔ Subdrill = (3 to 15) x D
✔ Charge length (C) ≥ 20 D
✔ Stemming ≥ 20 x D or (0.7 – 1.2) x B
✔ Stemming material size = D/10 to D/20

Link to World Blasting Innovators community. https://www.worldblastinginnovators.com/

https://www.miningdoc.tech/wp-content/uploads/2023/10/Animation-Video-Rev3.0.mp4
0
  • 0 0 Comments
  • 718 Views
  • 718 Reactions
  • 1 Follower
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Understanding block caving: principles and geological suitability
  • How is artificial intelligence being applied to ore body modelling and mine planning?
  • What are the most significant technological trends shaping the future of the global mining industry?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
    • On: April 17, 2026

    Mining Durability Cuts Remote Downtime

  • How to Extend the Lifespan of Mobile Stone Crushing Plants for Highly Abrasive Ores?
    • On: April 16, 2026

    How to Extend the Lifespan of Mobile Stone Crushing Plants ...

  • Releasing mining value through the theory of constraints
    • On: April 15, 2026

    Releasing mining value through the theory of constraints

  • The Benefits of a Rapid-Deploy Concrete Batching Plant for Sale for Moving Mine Fronts
    • On: April 14, 2026

    The Benefits of a Rapid-Deploy Concrete Batching Plant for Sale ...

  • Advanced Mobile Rock Crusher Technology Driving Innovation in Mining Industry
    • On: April 14, 2026

    Advanced Mobile Rock Crusher Technology Driving Innovation in Mining Industry

  • High-Altitude Synchronization Prevents Thermal Defects
    • On: April 14, 2026

    High-Altitude Synchronization Prevents Thermal Defects

  • 11 Safety Measures Every Construction Site Should Have In Place
    • On: April 14, 2026

    11 Safety Measures Every Construction Site Should Have In Place

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved