Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining DocExplainer
Added: October 8, 20242024-10-08T11:11:32-04:00 2024-10-08T11:11:32-04:00In: Mining Operations

What are the types of Delays in Rock Blasting?

  • 1
  • 1

In rock blasting, the timing of detonations plays a crucial role in optimizing fragmentation and controlling vibrations. The types of delays can be categorized based on their mechanisms and applications:

Instantaneous Delay

Description: All charges are detonated simultaneously.

Advantages: Simple to implement; used in situations where precise control over fragmentation is less critical.

Disadvantages: Can lead to excessive vibrations and poor fragmentation due to shock wave interaction between adjacent blasts.

Short Delay

Description: Detonations occur with very brief intervals (milliseconds) between holes.

Advantages: Improves fragmentation by minimizing the overlap of shock waves, leading to better control over rock breakage and reduced vibrations.

Disadvantages: Requires precise timing and can be complex to manage, especially in large-scale operations.

Controlled Delay

Description: Utilizes electronic detonators that allow for precise timing adjustments between blasts.

Advantages: Provides flexibility in blast design, enabling optimization for specific geological conditions. This method enhances fragmentation quality and reduces environmental impacts like ground vibration.

Disadvantages: Higher cost due to the technology involved.

Pyrotechnic Delay

Description: Traditional delay systems using pyrotechnic materials that burn at a controlled rate.

Advantages: Reliable and widely used in various blasting applications.

Disadvantages: Less precise than electronic systems and can be affected by environmental conditions.

Electronic Delay

Description: Advanced systems that use microchips to control detonation timing with high precision.

Advantages: Allows for complex blast patterns and improved safety by reducing the risk of premature detonations. It also enhances fragmentation by optimizing the timing of each charge.

Disadvantages: More expensive and requires specialized training for handling.

Conclusion

The choice of delay type significantly influences the effectiveness of rock blasting operations. Short and controlled delays are generally preferred for their ability to improve fragmentation while minimizing unwanted vibrations, making them suitable for modern blasting practices.

Bibliography

https://www.mdpi.com/2076-3417/13/1/85

https://www.sciencedirect.com/science/article/abs/pii/S0886779817306624

https://www.sciencedirect.com/science/article/pii/S2095268616302737

https://www.researchgate.net/publication/380577289_The_Role_of_Delays_in_the_Performance_of_Blasting

https://www.researchgate.net/publication/380946705_The_Role_of_Delays_in_the_Performance_of_Blasting

0
  • 0 0 Comments
  • 889 Views
  • 889 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Before the Raise Starts: What Actually Keeps Upstream Embankments Standing
  • Choosing Tailings Management Systems: Lessons from Grasberg Mine, Indonesia
  • STEINERT and Ferbasa are leading the way in sensor-based sorting in Latin America.

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • White House: no changes to Trump metals tariffs unless president announces them.
    • On: February 13, 2026

    White House: no changes to Trump metals tariffs unless president ...

  • Middlemount Mine Australia received a 7-year extension approval for coal mining until 2044.
    • On: February 13, 2026

    Middlemount Mine Australia received a 7-year extension approval for coal ...

  • Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones
    • On: February 13, 2026

    Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones

  • Optimizing Mining Operations with High-Performance Ore Crushing Machines
    • On: February 12, 2026

    Optimizing Mining Operations with High-Performance Ore Crushing Machines

  • Designing Tailings for the Century, Not the Quarter
    • On: February 12, 2026

    Designing Tailings for the Century, Not the Quarter

  • Smart slope monitoring turns risk into opportunity
    • On: February 12, 2026

    Smart slope monitoring turns risk into opportunity

  • Reducing Water and Energy Use with Concrete Batching Plant Australia in Mining Operations
    • On: February 9, 2026

    Reducing Water and Energy Use with Concrete Batching Plant Australia ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved