Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: January 29, 20262026-01-29T04:40:22-05:00 2026-01-29T04:40:22-05:00In: Mining Engineering

What geotechnical investigations are essential before constructing a pit ramp?

  • 0
  • 0

In the complex environment of open-pit mining, the design and construction of haul ramps represent a critical intersection between operational efficiency and geotechnical safety. A pit ramp is not merely a road; it is a structural element of the mine wall that must support the immense weight of loaded haul trucks while maintaining the integrity of the overall slope (Golestanifar, 2018). Given that haulage costs often account for a significant portion of a mine’s operating expenses, the geometry and stability of these ramps are paramount (Sullivan, n.d.).

Before breaking ground, a comprehensive suite of geotechnical investigations is essential to ensure that the ramp can withstand static and dynamic loads, environmental changes, and the inherent variability of the rock mass.

Characterization of rock mass and physical properties

The fundamental building block of any geotechnical investigation for a pit ramp is the detailed characterization of the rock through which the ramp will be excavated. Studies highlight that the construction of slope angles and benches is highly dependent on the physical and mechanical properties of the rocks (MDPI, 2025).

Key parameters to investigate:
  • Lithological mapping: identifying the different rock types (e.g., gneiss, schist, marble) and their spatial distribution is critical for predicting how the ground will behave under stress (Holley et al., n.d.).
  • Intact rock strength: laboratory testing to determine the Unconfined Compressive Strength (UCS) of the rock. This informs the bearing capacity of the ramp surface and the stability of the ramp-edge berms.
  • Discontinuity mapping: investigating joints, faults, and bedding planes. The orientation and spacing of these structures determine the likelihood of wedge or planar failures that could take out entire sections of a ramp (Sullivan, n.d.).
In-Situ stress and seismicity analysis

A pit ramp must be designed to withstand not only the vertical gravity loads but also the horizontal in-situ stresses present in the rock mass. Geotechnical investigations must establish the ratio between maximum stress and vertical stress (Holley et al., n.d.).

Furthermore, seismic risk assessment is a non-negotiable step. Investigations should calculate the expected maximum acceleration for the site to ensure that ramp gradients and berm widths can survive a seismic event without catastrophic failure. For instance, sites in seismically active zones may require a design that accounts for a 10% probability of exceedance in 50 years (Holley et al., n.d.).

Hydrological and hydrogeological assessment

Water is perhaps the greatest enemy of ramp stability. Geotechnical investigations must pinpoint the groundwater table and understand how it interacts with the ramp structure.

  • Pore pressure monitoring: High pore water pressure reduces the effective stress in the rock mass, which can trigger slope failures (Golestanifar, 2018).
  • Infiltration and advective heat transfer: modern research suggests that advective heat transfer associated with precipitation and infiltration can be used to infer percolation amounts in unsaturated soils, which is critical for understanding how water moves through the ramp foundation (Lu & LeCain, 2003).
  • Drainage requirements: investigations must determine if the ramp requires a “drained condition” design. A drained slope often allows for a steeper inter-ramp angle compared to an undrained one, significantly improving mine economics (Golestanifar, 2018).
Geometric and operational design constraints

The geotechnical investigation must inform the geometric layout of the ramp. This includes determining the “Inter-ramp Angle” (the angle between the toe of a slope where a ramp passes and the toe of the bench above it) and the “Overall Slope Angle” (Nancel-Penard et al., 2019). mandatory geometric considerations are:

  • Road width: standard practice often dictates a width 3.5 times that of the widest haul truck for two-lane traffic, though automation may allow for narrower designs if geotechnical conditions permit (Montana Tech, 2021).
  • Gradient: a 10% gradient is common, but this must be validated against the rolling resistance of the local rock and the mechanical limits of the fleet (Montana Tech, 2021).
  • Safety berms: federal regulations often require berms to be at least mid-axle height of the largest equipment (e-CFR, 2021, as cited in Montana Tech, 2021).
Pavement and wearing course evaluation

For in-pit ramps, the “pavement” is often unpaved granular material. Geotechnical investigations must assess the suitability of on-site materials for use as a wearing course. This involves testing for:

  • Rolling resistance: high resistance increases fuel costs and slows production (UBC, n.d.).
  • Trafficability: the ability of the material to maintain structural integrity under high tire pressures, especially when wet.
  • Dust and erosion potential: identifying materials that minimize dust and resist erosion from heavy runoff.
Conclusion

The safety and profitability of an open-pit mine are inextricably linked to the quality of its haul ramps. By conducting rigorous geotechnical investigations—covering rock mass characterization, in-situ stress, hydrogeology, and material performance—engineers can design ramps that minimize the stripping ratio while maximizing safety. As mining moves toward deeper pits and autonomous fleets, these investigations will only become more critical in managing the thin line between an optimized slope and a costly failure.

References

Golestanifar, M. (2018). Governing risk elements through open pit slope optimization. Journal of the Southern African Institute of Mining and Metallurgy, 118(1), 47–55. https://doi.org/10.17159/2411-9717/2018/v118n1a6

Lu, N., & LeCain, G. D. (2003). Percolation Induced Heat Transfer in Deep Unsaturated Zones. Journal of Geotechnical and Geoenvironmental Engineering, 129(11), 1040–1053. https://doi.org/10.1061/(asce)1090-0241(2003)129:11(1040

MDPI. (2025). Influence of Blasting Approaches in In-Pit Haul Road Construction on Emission Levels and Resource Management. Applied Sciences, 15(22), 12310. https://doi.org/10.3390/app152212310

Montana Tech. (2021). Adapting Open Pit Mine Design Fundamentals to Leverage the Advantages of Autonomous Haulage Systems. Digital Commons @ Montana Tech.

Nancel-Penard, P. et al. (2019). Value-Optimal design of ramps in open pit mining. Archives of Mining Science.

Sullivan, T. D. (n.d.). Pit Slope Design and Risk – A View of the current state of the art. SAIMM.

Holley, K., Skayman, P., & Zhiwei, H. (n.d.). Geotechnical Design for Open Pits at Tanjianshan, China. SAIMM.

0
  • 0 0 Comments
  • 102 Views
  • 92 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How is your site currently classifying technology-related downtime?
  • What maximum longitudinal gradients are acceptable for different classes of haul trucks?
  • What is the importance of geotechnical reconciliation between design and actual slope performance?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Beyond the stope edge: how fully autonomous mapping is redefining safety, accuracy, and decision-making in underground mines
    • On: February 2, 2026

    Beyond the stope edge: how fully autonomous mapping is redefining ...

  • Rio Tinto boosts solar energy capacity at Kennecott copper mine
    • On: January 30, 2026

    Rio Tinto boosts solar energy capacity at Kennecott copper mine

  • Rio Tinto strengthens its global low-carbon aluminium footprint through joint acquisition with Chalco of Votorantim's interest in CBA
    • On: January 30, 2026

    Rio Tinto strengthens its global low-carbon aluminium footprint through joint ...

  • Enhancing economic robustness in mining: the power of sensitivity and scenario analysis
    • On: January 30, 2026

    Enhancing economic robustness in mining: the power of sensitivity and ...

  • Scalability and Expansion: Stationary Concrete Batching Plant for Growing Mining Businesses
    • On: January 30, 2026

    Scalability and Expansion: Stationary Concrete Batching Plant for Growing Mining ...

  • London Metal Exchange resumes trade after one-hour delay.
    • On: January 30, 2026

    London Metal Exchange resumes trade after one-hour delay.

  • Cultivating the future: strategies for sustainable local talent development in mining
    • On: January 29, 2026

    Cultivating the future: strategies for sustainable local talent development in ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved