Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining DocBeginner
Added: March 25, 20232023-03-25T17:38:34-04:00 2023-03-25T17:38:34-04:00In: Mining Industry Research

What Quality assurance and checks are required for a Mine Ventilation modelling and planning?

  • 1
  • 1

Most mine ventilation engineers are involved in ventilation planning and design in some capacity. Ventilation modelling software used by a competent experienced ventilation engineer is extremely useful in developing good ventilation designs by allowing assessment of a wide range of potential options. Unfortunately, ventilation modelling undertaken by persons who do not have sufficient experience or knowledge usually results in a facade that covers up a fundamentally unsatisfactory design. Ventilation models are produced for a wide variety of purposes including: fault-finding of a problem area in a mine and options analysis for resolution of such problems ; a complete review or optimisation exercise of an entire mine’s ventilation system; or a much longer life-of-mine type of study. Models can be intended as the basis for studies with diverse purposes such as primary shaft or airway sizing, primary fan specification, examining re -entry times after blasting, resolving leakage or recirculation, or investigating the impact of fires or underground climate or cooling requirements. The concepts of ‘materiality’ and ‘fitness for purpose’ are essential to developing or using a ventilation model and serious mistakes have been made in wrongly using a ventilation model for purposes for which it was never intended, often because it is simply the most recent model on the mine site. Mistakes at this level often translate into faulty ventilation strategies and inefficient or ineffective use of scarce capital for ventilation projects . Validating a ventilation model is a time-consuming and expensive process and not every model must (or even should) be fully validated to meet the objectives at that time. This paper discusses the application of quality assurance in ventilation planning with particular respect to the ‘basis of design’ (BOD) as well as the standards for validating a ventilation model. It also provides a recommended way of dealing with non-conformances in measured versus modelled values of critical parameters in the model.

Follow the link to download.

Stds-for-vent-models—vent-planning

What Quality assurance and checks are required for a Mine Ventilation modelling and planning?
0
  • 0 0 Comments
  • 760 Views
  • 760 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the latest research consensus on using hyperspectral drone surveys to reduce exploration drilling costs?
  • What does recent geomechanical research reveal about pillar failure prediction in deep room-and-pillar mines?
  • What do recent studies reveal about bioleaching viability for low-grade copper and gold ores?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Sponsored Ads

aalan
  • Recent
  • Ore Crushing Plant for Mountain Mines: Managing Access, Transport, and Production
    • On: September 12, 2026

    Ore Crushing Plant for Mountain Mines: Managing Access, Transport, and ...

  • How Does the Crushing Chamber Design of Aggregate Crushing Equipment Affect Output and Finished Product Quality?
    • On: September 12, 2026

    How Does the Crushing Chamber Design of Aggregate Crushing Equipment ...

  • How Can Mine Construction Teams Reduce Rework During Fast-Track Projects?
    • On: September 8, 2026

    How Can Mine Construction Teams Reduce Rework During Fast-Track Projects?

  • The Mine in Your Pocket: Why Mobile ERP Is Reshaping Mining Operations
    • On: September 8, 2026

    The Mine in Your Pocket: Why Mobile ERP Is Reshaping ...

  • How Concrete Is Used in Crusher and Screening Plant Foundations at Guatemalan Mines
    • On: September 4, 2026

    How Concrete Is Used in Crusher and Screening Plant Foundations ...

  • Portable Crusher Plant for Hard Rock Mines: How to Design the Crushing Circuit Before Grinding
    • On: September 3, 2026

    Portable Crusher Plant for Hard Rock Mines: How to Design ...

  • From Data to Decisions: Why Mining Intelligence Is the Next Competitive Advantage
    • On: September 1, 2026

    From Data to Decisions: Why Mining Intelligence Is the Next ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved