Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: October 8, 20262026-10-08T04:45:09-04:00 2026-10-08T04:45:09-04:00In: Mining Operations

What's the correct approach to scheduling equipment fleet size against a rising strip ratio in later pit stages?

  • 0
  • 0

Open-pit mines face a series of economical and practical problems when mining pits become deeper over various developmental stages. Rising strip ratio means that significantly more overburden material should be moved along with the ore. Deeper ramps mean greater time needed for hauling. The standard solution of merely adding new haul trucks is not effective enough. Extra trucks result in extra traffic jams on ramps, waiting at the shovels’ loading sites, as well as increased maintenance costs. Effective scheduling of the fleet needs mathematics and engineering solutions.

Conventional spreadsheet models fail to account for the complex non-linear nature of the maintenance costs associated with heavy-haul fleets. Equipment repair costs fluctuate significantly based on the number of truck operating hours and engine overhauls. Mixed integer program models allow scheduling the number of truck operating hours within different age groups over several years. Life of mine mathematical model lowers maintenance costs by 10% to 25% and maintains the achievement of annual production levels. Two-stage goal programming fleet management systems combine short-term production schedules with dynamic truck dispatching. The first optimization stage consists of allocating shovels at mining faces for grade requirements. At the second stage, trucks are dispatched to keep shovels running and production deviations below 4%.

Standard match factor formulae generally consider full equipment availability and constant arrival times, leading to a higher estimate of fleet efficiency compared to what mine planners achieve. Mining operations face mechanical breakdowns, variations in loading times, and cycle delays depending on travel routes. The expanded match factor includes a performance factor for equipment availability, travel speed, and rock fragmentation. For heterogeneous fleets where more than one type of trucks uses the same ramp, differences in travel speed lead to vehicle bunching since the speed on the ramp depends on the slower truck. Fragmentation, due to blasting, affects bucket fill factors and loading times. With the inclusion of operational downtime and fragmentation factors in the fleet size formulae, the effective match factor rises from 0.74 to 0.85.

As the open pit mining goes deeper, there is need to make some physical and technological improvements to maintain efficiency in hauling amid high stripping. The trolley assist system allows the diesel electric haul trucks to connect to the catenary line overhead wires during steep uphill sections. The electric connection increases the speed of the loaded uphill operation by about 10 kilometers per hour and decreases the use of diesel and engine overhauls. However, trolley assist system can only be used if there are stable ramps of at least 500 meters in length and should be in use for not less than two years. The mine designers will have to increase the width of haul road from the normal 38 meters to 51 meters for the 320 tonne trucks.

The problem of equipment scheduling in the light of increasing strip ratio cannot be solved simply through buying more haul trucks. There must be incorporation of mathematical optimization of the fleet, match factors, and infrastructural improvements. Multi-period goal programming and integer programming help achieve minimum maintenance costs but at the same time make it possible to stick to the production schedule. Long-term calculations of the match factor will avoid too much fleet turnover due to inclusion of the factors of mechanical time loss and fragmentation problems.

0
  • 0 0 Comments
  • 31 Views
  • 31 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the practical method for optimizing ventilation-on-demand systems without compromising air quality compliance?
  • How Better Frontline Communication Can Improve Mining Operations
  • What's the practical method for optimizing drill and blast patterns against downstream crusher throughput targets?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalanaalan

Sidebar

Sponsored Ads

aalan

Sponsored Ads

aalan

Sponsored Ads

aalan
Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved