Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs

Mining Doc Latest Posts

Jean Marais (Sanodea Group)
  • 0
  • 0
Jean Marais (Sanodea Group)
Added: October 6, 20252025-10-06T04:14:42-04:00 2025-10-06T04:14:42-04:00In: Mining Engineering

Quality Engineering in Mining: An Executive Case Study

  • 0
  • 0

Author: Mr. Jean Marais, Founder & Group Executive Chairman

Sanodea Group. Rooted in Africa. Driven by Innovation. Built for Global Impact.

Presence: Africa, Europe, Middle East, Asia, North America

Over more than 30 years in mining leadership across Africa, Asia, Europe, and the Middle East, I have seen great mines struggle — not because of lack of ore or capital, but because minor engineering failures cascade into major losses. In this case study, I present a framework and concrete examples for how mining operations can embed quality engineering as a strategic advantage — not a maintenance afterthought.


Executive Summary: Why Engineering Quality is a Strategic Imperative in Mining

In modern mining, the margin between success and failure is razor thin. Investors expect consistent production, ESG accountability, and safety compliance. A breakdown in a single component can halt entire plants, degrade community trust, and jeopardize financing. When we ran operations in West Africa, a single conveyor failure repeated over months cost tens of millions in lost output, disrupted supply chains, and led to negative investor sentiment. That experience taught me a lesson: reliability is the silent backbone of every enduring mine.

At present, gold trades around USD 3,860 per ounce, meaning that a 1,000-ounce/hour operation experiencing even one hour of stoppage directly forfeits USD 3.86 million in revenue, even before considering overheads, penalties, and reputational damage. Renewable commitments, carbon tracking, and ESG compliance now demand that mines not only function — they do so predictably. In this environment, engineering quality is not optional. It is strategic.


Chapter 1: The Hidden Costs of Unreliable Engineering Components

It is relatively easy to see when mining operations underperform — but far harder to trace how small engineering deficiencies contribute to that underperformance. Across operations I’ve overseen or advised, I have catalogued recurring patterns:

  • Bearings and couplings failing prematurely due to cheap substitutes or misalignment.

  • Conveyor chains tearing under heavy loads or abrasive dust, causing cascading shutdowns.

  • Drive systems overheating or failing in thermal stress, especially in tropical climates.

  • Emergency spares being flown into remote mines at enormous cost, sometimes via charter aircraft.

  • Safety incidents triggered by mechanical failures — fatigue cracks, sudden torque spikes, or coupling displacements.

In one operation, a single faulty coupling caused a mill shutdown for 12 hours. The direct loss in gold output, energy consumption, and downstream processing exceeded USD 1.2 million. That one event alone nearly funded a year’s budget for the reliability program we later implemented.

The point is: these failures are not “maintenance issues.” They are strategic erosions of profitability, stakeholder confidence, and operational credibility.


Chapter 2: The Sanodea Quality Engineering Framework

Over years of consulting and operations, we have refined a holistic framework to bring engineering reliability into the core of mining transformation. It unfolds in five integrated dimensions:

1. Board Mandate & Accountability

A reliability transformation must start at the top. In every effective deployment I have led, the board must commit to reliability KPIs: mean time between failure (MTBF), mean time to repair (MTTR), safety incident rates tied to mechanical failure, and percentage of assets under predictive monitoring. The board must own these metrics, not defer them to operations.

2. Lifecycle Costing & Procurement Discipline

Too many mines compete on item price instead of total lifecycle cost. I have insisted that procurement models include projected replacement cycles, spare part logistics, downtime risk, and energy drag. In one copper mine, a component 20% more expensive up front saved 30% total lifecycle cost and paid for itself in two years.

3. Sensorization & Predictive Analytics

Engineering reliability today depends on data. Vibration sensors, acoustic monitors, temperature probes, and motion analysis become indispensable. In one gold operation, we installed sensors at 12 critical nodes along conveyors, drives, and bearings; we then trained AI models to detect anomalies two weeks before failure. That predictive window allowed maintenance scheduling without production loss.

4. Certified Suppliers & Reliability Partnerships

It is not enough to buy off-the-shelf parts. I insist on engineers certifying components (ISO, API, OEM specs), embedding them into the local supply chain. We have partnered with manufacturers who guarantee performance envelopes and failure warranties. These partnerships ensure parts last longer, logistics are faster, and reliability becomes sustainable.

5. Governance, Auditing & Reporting

Reliability must be auditable. Third-party audits, benchmark comparisons, and transparent reliability dashboards are essential. I require that mines publish reliability metrics to lenders or regulators to build credibility and lower capital costs. One operation we advised saw its cost of capital drop by 25 basis points once we produced consistent failure-prediction reports accepted by a major DFI.


Chapter 3: Extended Case Studies (Anonymized case examples provided to demonstrate practical relevance and outcomes achieved)

Case Study A — Gold Mine, West Africa: Conveyor Reliability Overhaul

This mid-tier gold operation processed roughly 1,000 oz/day through a crushing and conveying circuit. Over three years, it suffered repeated conveyor chain and sprocket failures, incurring 150–200 hours/year of unplanned downtime. The socioeconomic impact was amplified: community unrest over job losses, investor anxiety over variable revenues, and pressure on government royalty flows.

We intervened by first mapping load profiles, abrasion environments, and thermal stress zones. We then specified high-tensile, dust-sealed chains rated beyond design loads, integrated vibration sensors at 10 nodes, and installed a predictive analytics module. Maintenance was restructured into condition-based cycles, not calendar schedules.

Within the first year, unplanned shutdowns fell by 45%. Output improved ~3% despite no change in ore grade. The investment paid for itself within 10 months. Community perception improved as operating stability restored. Investors publicly cited the reliability improvement during expansion financing. The mine’s board now embeds reliability metrics into its quarterly reporting.

Case Study B — Process Plant, East Africa: Drive Safety & Compliance

In an integrated mining-cement environment, a processing drive system repeatedly failed during peak load shifts. The mine faced stoppages even during routine maintenance windows and was under scrutiny from regulators for safety nonconformities.

We replaced legacy torque couplings with certified fail-safe limiters, embedded torque sensors and temperature monitors, and integrated alarms into the operations control room as part of the safety management system. We also trained operators in interpreting alerts and fault trends.

Over 18 months, mechanical safety incidents tied to drive failures declined by more than 60%. The mine passed its safety audit without reservations. Insurance premiums dropped by ~20%. Local communities expressed confidence in safer operations. This intervention arguably saved the plant from regulatory suspension.

Case Study C — Copper Operation, Southern Africa: Lifecycle Cost Optimization

A remote copper mine had spiraling maintenance budgets, with frequent replacement of bearings, coupling sets, and auxiliary systems. The attrition of parts and supply-chain delays created cascading losses beyond the parts themselves.

We conducted benchmarking across global peer mines, introduced high-performance, wear-envelope bearings, and coupled them with predictive analytics. We restructured maintenance from reactive to condition-based models. Spare part stocking was optimized, reducing lead time from weeks to days.

Over 36 months, total lifecycle maintenance cost fell by ~22%. Average asset life extended by 4–5 years. Reactive work dropped 30%. The mine’s margins stabilized even during periods of copper price decline. Key stakeholders cited reliability transformation as a reason to support continued investment.


Chapter 4: Expected Outcomes and Benchmarks

Mines that fully commit to this framework can anticipate:

  • A 30–40% decrease in unplanned downtime compared to baseline operations

  • 50–60% fewer safety incidents traceable to mechanical failure

  • 20–30% savings in maintenance budgets through reduced reactive work

  • 10–15% improvement in throughput, as machines no longer idle unexpectedly

  • Reduced waste rates by 30–35%, aligning with ESG goals

  • Capital cost reductions of 15–25 bps, because investors view low-engineering risk more favorably

Globally, mines in the top quartile of reliability (i.e. <3% downtime) consistently command 10–20% valuation premiums over peers — proof that reliability pays in multiples, not just margins.


Chapter 5: Strategic Value for Stakeholders

For governments, reliable mines deliver stable royalty flows, safer operations, and strengthened trust in governance. For investors, low operational risk translates to more favorable debt terms and lower discount rates. For communities, reduced stoppages and safer work environments foster stronger social licence. For operators, lower OPEX, predictable performance, and resilience are the backbone of long-term competitiveness.


Chapter 6: Sanodea Group’s Execution Role

Sanodea Group acts as the bridge between strategy and engineering. We:

  • Work with boards to embed reliability KPIs into governance

  • Deploy sensor and analytics platforms via Sanodea Innovations

  • Secure supply arrangements with certified component firms under Sanodea Commerce

  • Engage communities and workforce safety through Sanodea Life

  • Build training and quality assurance pipelines via Sanodea Legacy

  • Oversee operations and project execution via Sanodea Resources

Our model is co-created: we embed local capability, transfer knowledge, and align capacity so reliability becomes part of the operating DNA, not a short-term project.


In Conclusion

Mining’s future will be measured not just by tonnage or ESG statements, but by the reliability that underlies operations. Quality engineering is not a technical detail — it is the central architecture on which predictability, safety, and value rest.

By embracing precise engineering, predictive systems, and governance, mines can reduce risks, enhance performance, and strengthen stakeholder trust. That is how sustainable, competitive, and legitimate mining is built.

Sanodea Group: Advisory | Innovations | Commerce | Resources | Life & Wellness | Legacy & Education.

explore. Engage. EVOLVE.


References:

  • Deloitte. Tracking the Trends 2023: The Top 10 Issues Transforming the Future of Mining. Deloitte Global, 2023.

  • International Council on Mining & Metals (ICMM). Safety Data Report 2022: Benchmarking Mining Safety Trends. ICMM, 2023.

  • International Finance Corporation (IFC). ESG Performance Standards in Extractive Industries. World Bank Group, 2022.

  • KPMG. Global Mining Outlook 2023. KPMG International, 2023.

  • McKinsey & Company. Reducing Downtime in Mining with Predictive Maintenance and Digital Operations.McKinsey, 2022.

  • PricewaterhouseCoopers (PwC). Mine 2024: The Future of the Mining Industry in a Sustainable World. PwC, 2024.

  • Sanodea Group. Engineering Reliability & Operational Transformation Reports (2010–2025). Internal Publications.

  • World Bank. Community Engagement in Mining: Lessons for Africa. World Bank, 2023.

  • World Gold Council. Responsible Gold Mining Principles and Market Outlook. World Gold Council, 2023.

Quality Engineering in Mining: An Executive Case Study
0
  • 0 0 Comments
  • 317 Views
  • 317 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What are common causes of downtime?
  • What types of mining shovels are commonly used?
  • Let’s talk about large mining shovel.

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Ads – Mining Solutions

aalan
  • Recent
  • The Implementation Path of Systematic Solutions for Energy-Saving Crushing Production Lines in Latin America
    • On: November 11, 2025

    The Implementation Path of Systematic Solutions for Energy-Saving Crushing Production ...

  • Rio Tinto and Canada Growth Fund announce transaction to advance Canadian production of scandium
    • On: November 7, 2025

    Rio Tinto and Canada Growth Fund announce transaction to advance ...

  • ArcelorMittal posts third-quarter profit beat, flags optimism for 2026
    • On: November 7, 2025

    ArcelorMittal posts third-quarter profit beat, flags optimism for 2026

  • Funds amass record bull bets on aluminium as market narrative turns.
    • On: November 6, 2025

    Funds amass record bull bets on aluminium as market narrative ...

  • 10 Workplace safety tips for a secure environment
    • On: November 6, 2025

    10 Workplace safety tips for a secure environment

  • 13 Essential Construction Site Safety Tips: A Comprehensive Guide (2025)
    • On: November 6, 2025

    13 Essential Construction Site Safety Tips: A Comprehensive Guide (2025)

  • Construction Safety Management: Navigating Common Risks and Key Responsibilities on Site
    • On: November 6, 2025

    Construction Safety Management: Navigating Common Risks and Key Responsibilities on ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 21 Posts
  • 0 Comments
Beginner
Job Posting (View more here)


Job De
scription: Alternate Superintendent - Metallurgy

Location: Papua New Guinea


Apply on the company website


Job Description: Metallurgy Superintendent


Location: USA

Click here to apply


Job: Mill - Control Room Operator


Location: Canada


Apply on the company website
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2025 Mining Doc. All Rights Reserved