Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: January 20, 20262026-01-20T06:01:46-05:00 2026-01-20T06:01:46-05:00In: Mining Engineering

What are the main technical causes of overbreak and underbreak in production blasting, and how can they be controlled?

  • 0
  • 0

In production blasting, overbreak refers to the excavation of rock beyond the planned design limit, while underbreak is the failure to remove rock within that limit. Both represent significant technical failures: overbreak leads to dilution and increased support costs, while underbreak requires expensive secondary blasting or mechanical scaling. Let’s explore the causes and mitigation strategies.

Main Technical Causes

The causes of overbreak and underbreak generally fall into three categories: drilling errors, blast design, and geology.

Overbreak (excessive breakage)
  • Excessive explosive energy: high powder factors (too much explosive per cubic meter) or using high-density, high-VOD (Velocity of Detonation) explosives in perimeter holes creates excessive radial cracking and gas pressure that shatters the surrounding rock.
  • Improper drilling (look-out angle): to maintain the tunnel’s profile as the drill progresses, drillers often tilt the holes outward. If this “look-out angle” is too steep, it creates a “saw-tooth” profile, resulting in significant over-excavation.
  • Poor delay sequencing: if perimeter holes fire too early or simultaneously with production holes without a free face to move into, the energy is forced back into the solid rock mass (backbreak).
  • Geological intersections: high-pressure gas from the blast can penetrate existing joints, faults, or bedding planes, prying large blocks of rock loose far beyond the intended boundary.
Underbreak (insufficient breakage)
  • Inadequate burden: if the distance between the perimeter holes and the last row of production holes (the burden) is too large, the explosive energy cannot effectively shear the rock, leaving “tights” or protrusions.
  • Hole deviation: if drill holes converge (tilt toward each other) rather than remaining parallel, the area between them may not receive enough energy to break, leaving unexcavated rock.
  • Low explosive energy: using too little charge or an explosive with insufficient gas pressure to overcome the rock’s tensile strength.
  • Misfires or short rounds: technical failures in the initiation system (cut wires or faulty detonators) leave whole sections of the face unblasted.
Technical control measures

Controlling these phenomena requires a combination of high-precision engineering and “Perimeter Control” techniques.

Perimeter control techniques
Technique Description Primary Goal
Smooth Blasting Perimeter holes are loaded with light, decoupled charges and fired last in the sequence. Minimize overbreak and leave a smooth wall.
Pre-splitting A row of closely spaced holes is fired before the main production blast to create a fracture plane. Protect the final wall from production blast vibrations.
Line Drilling A row of very closely spaced, uncharged holes is drilled at the boundary. Acts as a physical barrier to stop cracks from propagating.
Cushion Blasting Large diameter holes with small diameter charges; the “air cushion” softens the shock wave. Reduce borehole pressure and micro-fracturing.
 Operational controls
  • Decoupled charges: using a cartridge with a smaller diameter than the borehole (e.g., a 25mm charge in a 45mm hole).5 The air gap acts as a buffer, significantly reducing the Peak Particle Velocity (PPV) and preventing radial cracks from extending too far.
  • Drilling accuracy: using computerized drill jumbos with GPS or laser guidance to ensure holes are perfectly parallel and the look-out angle is minimized (typically kept under 3⁰ to 5⁰).
  • Electronic detonators: these provide millisecond precision (±0.1ms accuracy). Precise timing ensures that each hole has a “free face” to break into, reducing the back-pressure that causes overbreak.
  • Stemming management: proper use of stemming (inert material like crushed stone) ensures that explosive gases are confined long enough to break the rock effectively, reducing the “cratering” effect at the collar of the hole.
0
  • 0 0 Comments
  • 1k Views
  • 1k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How to develop a mine production schedule that satisfies mill feed grade requirements, mining constraints, and project NPV objectives simultaneously?
  • What are the engineering criteria for selecting longhole stoping versus cut-and-fill as the primary mining method in a narrow, steeply ...
  • What advances have been made in real-time rock mass characterisation using LiDAR and photogrammetry to replace manual geotechnical mapping?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Gold on track for fourth weekly loss on hawkish Fed bets
    • On: June 26, 2026

    Gold on track for fourth weekly loss on hawkish Fed ...

  • Zimbabwe exploring minerals-backed deals with China to fund infrastructure
    • On: June 26, 2026

    Zimbabwe exploring minerals-backed deals with China to fund infrastructure

  • Concrete Batching Plant Price Analysis for Mining Camps, Tailings Dams, and Processing Facilities
    • On: June 25, 2026

    Concrete Batching Plant Price Analysis for Mining Camps, Tailings Dams, ...

  • Scaling Business Operations with Mobile Crushers for Sale Investment
    • On: June 24, 2026

    Scaling Business Operations with Mobile Crushers for Sale Investment

  • Hydrocarbon Emission Baseline and Multi-Stage Filtration Engineering in Urban Mixing Operations
    • On: June 22, 2026

    Hydrocarbon Emission Baseline and Multi-Stage Filtration Engineering in Urban Mixing ...

  • Congo miners seek delay to 5% worker equity rule before July deadline
    • On: June 19, 2026

    Congo miners seek delay to 5% worker equity rule before ...

  • How Can Peruvian Customers Balance Cost and Performance?
    • On: June 18, 2026

    How Can Peruvian Customers Balance Cost and Performance?

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved