Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: August 12, 20262026-08-12T04:19:31-04:00 2026-08-12T04:19:31-04:00In: Mining Engineering

What's the correct approach to sequencing a pushback to maximize NPV without starving mill feed?

  • 0
  • 0

In open pit mining, three important considerations guide the success of such ventures, and these include pushbacks, Net Present Value (NPV), and mill feed. A pushback refers to an adjacent area of material scheduled to be removed to reach the final pit limits. NPV stands for the discounting of cash flows in the future as the main criterion for project valuation, whereas mill feed refers to the continuous supply of ore to the processing mill.

The major problem in sequence scheduling involves balancing between quick extraction of the ore to optimize the NPV on one side and providing a steady flow of mill feed on the other. Optimizing the NPV will require the postponement of the waste stripping in order to get valuable ore earlier. But doing so may lead to the loss of valuable future time because of the large stripping of the waste.

In general, sequences were obtained through deterministic algorithms, concentrating solely on geometric growth. Standard methods often result in inability to keep mill feed since they lack consideration of geological heterogeneity and processing limits. As a consequence of neglecting these limitations at the design stage, sequences require highly variable extraction rates that make it necessary to modify cut-off grades or stop processing, which drastically reduces expected NPV (Consuegra & Dimitrakopoulos, 2010).

The right way to deal with this problem involves algorithmic integration that optimizes sequencing, scheduling, and stockpiling at the same time. Instead of using already known nested pits, current approaches employ integer programming to create schedules according to processing limitations. With regard to the use of the milling capabilities as hard constraints, designers provide the precise schedule for waste stripping that exposes the needed amount of ore (Agosti et al., 2021).

Moreover, to absolutely ensure that there is no starving, sequencing should use stochastic programming to cope with uncertainties in grades. Using one deterministic program would mean that any drop in grade will interrupt the feed. Multi-stage approaches in dealing with uncertainty will help planners construct schedules to obtain maximum NPV in different simulations (Jelvez et al., 2023). The approach ensures enough reserves are left available to offset geological impacts (Goodfellow & Dimitrakopoulos, 2013).

In summary, sequencing a push back to get maximum NPV without starving the mill calls for abandoning geometric sequencing and adopting more flexible approaches. Stockpiling flows along with stochastic simulation can be used together with mathematical models to ensure that an ongoing stream of ores is secured.

References

Agosti, A., Utili, S., Gregory, D., Lapworth, A., Samardzic, J., & Prawasono, A. (2021). Design of an open-pit gold mine by optimal pitwall profiles. CIM Journal, 12(3), 149–168. https://doi.org/10.1080/19236026.2021.1979382

Consuegra, F. R. A., & Dimitrakopoulos, R. (2010). Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons. Mining Technology, 119(2), 88–101. https://doi.org/10.1179/037178410×12780655704761

Goodfellow, R., & Dimitrakopoulos, R. (2013). Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines. Mining Technology, 122(2), 67–77. https://doi.org/10.1179/147490013×13639459465736

Jelvez, E., Ortiz, J., Varela, N. M., Askari-Nasab, H., & Nelis, G. (2023). A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty. Mathematics, 11(18), 3907. https://doi.org/10.3390/math11183907

What's the correct approach to sequencing a pushback to maximize NPV without starving mill feed?
0
  • 0 0 Comments
  • 21 Views
  • 21 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How to validate pit slope design assumptions against actual geotechnical monitoring data?
  • How do you calibrate and validate a shovel payload monitoring system to reduce overloading of haul trucks and improve fleet ...
  • What are the technical and economic barriers to implementing in-situ leaching (ISL) as an alternative to conventional open-pit mining for ...

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Mobile Jaw Crusher for Sale for Hard Rock Mining: How to Configure Equipment for Demanding Crushing Conditions
    • On: August 12, 2026

    Mobile Jaw Crusher for Sale for Hard Rock Mining: How ...

  • From Raw Stone to Construction Aggregate: The Complete Processing Process
    • On: August 12, 2026

    From Raw Stone to Construction Aggregate: The Complete Processing Process

  • Using a Ready Mix Concrete Batching Plant for Mining Tunnel Lining and Shaft Construction
    • On: August 11, 2026

    Using a Ready Mix Concrete Batching Plant for Mining Tunnel ...

  • High-Altitude Motor and Power Selection for Andean Mining Mills
    • On: August 11, 2026

    High-Altitude Motor and Power Selection for Andean Mining Mills

  • Why Concrete Line Pumps Are Becoming Essential for Construction Projects in Peru’s Mountain Areas
    • On: August 4, 2026

    Why Concrete Line Pumps Are Becoming Essential for Construction Projects ...

  • Sand Making Machine in Mining Industry: Supporting Sustainable Resource Utilization
    • On: August 4, 2026

    Sand Making Machine in Mining Industry: Supporting Sustainable Resource Utilization

  • Strengthening Workforce Security in Modern Mining Operations
    • On: August 1, 2026

    Strengthening Workforce Security in Modern Mining Operations

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved