Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: June 30, 20252025-06-30T11:39:51-04:00 2025-06-30T11:39:51-04:00In: Mining Engineering

What are fundamental elements of an Open Pit mine?

  • 0
  • 0

The fundamental elements of an open pit mine are the key physical and operational components that define its structure, function, and efficiency. These elements are essential for both the design and operation of the mine. The most important are:

The benches

It is a fundamental technological element of open-pit mining, representing a portion of the overburden or orebody that is removed independently and served by its own dedicated transport systems.

Each bench generally has two exposed surfaces:

  • The working face
  • The bench slope

Benches that retreat during open-pit mining operations are referred to as operating benches. Benches other than those in active operation are bordered by narrow platforms, typically 20% to 50% of the bench height in width. These platforms are designed to enhance slope stability and are known as safety berms.

A portion of the mined area, limited in length and worked using independent drilling and loading equipment, is called a block.

The Pit edges

The pit edges are the lateral surfaces that define the voids created by mining operations. These include the benches and slopes of the pit.

There are two types of pit edges:

  • Working edges
  • Non-working edges

Working edges refer to the set of benches where mining activities are progressively carried out. Non-working edges are areas where no mining operations take place; they are used for material haulage and to ensure operational safety.

The Pit outline

The upper outline of the pit is the intersection between the upper edge of the pit and the original ground surface. The lower outline is the intersection between the lower edge of the pit and its bottom.

Pit Slope (Bench Slope)

The primary position of the pit edge at any given stage of mining operations is defined by the pit slope. This slope is an imaginary surface connecting the upper and lower contours of the pit.

The pit slope angle is determined based on:

  • The depth position of the operation (Hx)
  • The width of the working platform and safety berm
  • The geomechanical strength of the rock forming the pit walls

For active pit edges, the slope angle (γ₁) is always less than that of the inactive or unmined pit edges (γ₂).

As a general rule, lower slope angles are adopted when dealing with weak or unstable rock formations. Conversely, steeper angles are used for strong or competent rock.

The final pit slope (also known as the ultimate or liquidation slope) refers to the overall angle of the pit walls during the final stage of the mine’s life. This angle is selected based on detailed geotechnical calculations to ensure wall stability and to minimize the amount of waste material to be removed.

In practice, the final pit slope angle usually corresponds to the slope angle applied to the unmined (inactive) side of the pit. That is, γₗ = γ₂.

0
  • 0 0 Comments
  • 1k Views
  • 1k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Rock mechanics: the unsung hero of modern mines
  • Advanced simulations make mines predictable
  • 80% of fragmentation problems don’t come from explosives… they come from drilling

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Global Demand for Stationary Concrete Batching Plants in the Mining Sector
    • On: February 23, 2026

    Global Demand for Stationary Concrete Batching Plants in the Mining ...

    • On: February 23, 2026

    Mining Drone Technology: How Smart Aerial Systems Are Transforming Modern ...

  • Newmont beats profit forecast, plans $1.4 billion investment in Newcrest assets
    • On: February 20, 2026

    Newmont beats profit forecast, plans $1.4 billion investment in Newcrest ...

  • Rio Tinto reports solid 2025 results as copper growth and cost discipline drive performance
    • On: February 20, 2026

    Rio Tinto reports solid 2025 results as copper growth and ...

  • White House: no changes to Trump metals tariffs unless president announces them.
    • On: February 13, 2026

    White House: no changes to Trump metals tariffs unless president ...

  • Middlemount Mine Australia received a 7-year extension approval for coal mining until 2044.
    • On: February 13, 2026

    Middlemount Mine Australia received a 7-year extension approval for coal ...

  • Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones
    • On: February 13, 2026

    Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved