Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocExplainer
Added: August 4, 20262026-08-04T08:00:58-04:00 2026-08-04T08:00:58-04:00In: Geology

How to establish and maintain a mine's geological and geotechnical model as a foundation for all engineering decisions?

  • 0
  • 0

The creation of a solid base for mining engineering requires an explicit distinction between two important notions, namely geological and geotechnical models. The geological model provides a three-dimensional view of the geological structure of the earth. In turn, the geotechnical model defines certain mechanical properties for the geological formations. As a result, both models minimize financial and safety risks related to uncertainty below the surface (Zhou & Guo, 2020).

The process of creating a geological model begins with an extensive amount of data collection, which entails core drilling, mapping the surface, and the analysis of large areas of hydrogeology. Current techniques gradually move toward being multidisciplinary, combining traditional well-logging methods with geophysical data. Such a combination allows mining engineers to define the structure of a mineral deposit in detail, showing its lateral lithological variability and complicated fault systems before the start of any digging (Charbaoui et al., 2023).

Once the geological structure has been described, engineers create the geotechnical model using the physical and mechanical properties of the described formations. Even though the classical method included expensive core sample laboratory tests, nowadays, the automation of geotechnical characterization through geophysical logging is widely used. Rock density and uniaxial compressive strength can be accurately determined through sonic transit time. This data is then spatially interpolated to produce three-dimensional geotechnical block models (Zhou et al., 2001).

These models become the basis for further engineering calculations. In the case of an open pit mine, the geotechnical model determines the safety limits of the angles of pit slopes and their design. For an underground mine, this means proper stoping sequence, pillar size, and necessary support measures. Evaluating the rock-mass response with respect to these designed structural elements determines the success of the whole mining operation (Elmouttie & Dean, 2020).

However, the creation of such models is a gradual process that does not end with the initial design of the model but extends throughout its lifetime as part of the mining operation. With further excavation and exposure of new rock layers, any existing structural hypotheses have to be constantly checked in accordance with the current state of affairs. The use of terrestrial radar, satellite interferometry, and piezometers provides consistent feedback from the field. It allows re-calibrating the model on the regular basis and thus recognizing possible slope instability (Elmouttie & Dean, 2020).

In summary, it is apparent that geologic and geotechnical modeling represent dynamic processes, which should be adjusted at the same time as the mining process. By utilizing the continuously updated information collected by field measurements at drill holes, modern geophysical methods, and monitoring systems, miners will be able to react to any changes in the properties of rock mass immediately. The maintenance of these dynamic models guarantees the engineering decisions made based on facts.

Image credits: SRK Consulting (Available here: https://www.srk.com/en/services/3d-geological-modelling)
References

Charbaoui, A., Kchikach, A., Jaffal, M., Khadiri, O. Y., Guernouche, M., Amar, M., Bikarnaf, A., Jourani, E., & Khelifi, N. (2023). New Insights from Geophysical, Hydrogeological and Borehole Data into the Deep Structure of the Louta Phosphatic Deposit (Gantour Basin, Morocco): Mining Implications. Geosciences, 13, 357. https://doi.org/10.3390/geosciences13120357

Elmouttie, M., & Dean, P. (2020). Systems Engineering Approach to Slope Stability Monitoring in the Digital Mine. Resources, 9, 42. https://doi.org/10.3390/resources9040042

Zhou, B., & Guo, H. (2020). Applications of Geophysical Logs to Coal Mining—Some Illustrative Examples. Resources, 9, 11. https://doi.org/10.3390/resources9020011

Zhou, B., Hatherly, P., Guo, H., & Poulsen, B. (2001). Automated Geotechnical Characterisation from Geophysical Logs: Examples from Southern Colliery, Central Queensland. Exploration Geophysics, 32, 336–339. https://doi.org/10.1071/eg01336

0
  • 0 0 Comments
  • 20 Views
  • 20 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How do you design a grade-control drilling programme for a bulk open-pit operation to minimise ore misclassification and dilution?
  • What petrographic and mineralogical analyses should be routinely performed on ore samples to guide metallurgical test work programmes?
  • How do you assess the geological uncertainty in a resource model and communicate it meaningfully in a JORC-compliant report?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

  • Recent
  • Why Concrete Line Pumps Are Becoming Essential for Construction Projects in Peru’s Mountain Areas
    • On: August 4, 2026

    Why Concrete Line Pumps Are Becoming Essential for Construction Projects ...

  • Sand Making Machine in Mining Industry: Supporting Sustainable Resource Utilization
    • On: August 4, 2026

    Sand Making Machine in Mining Industry: Supporting Sustainable Resource Utilization

  • Strengthening Workforce Security in Modern Mining Operations
    • On: August 1, 2026

    Strengthening Workforce Security in Modern Mining Operations

  • How Mobile Jaw Crusher Price Changes for Mining and Construction Applications
    • On: August 1, 2026

    How Mobile Jaw Crusher Price Changes for Mining and Construction ...

  • What Really Prevents Costly Downtime? The Missing Link Between Maintenance and Mining Performance
    • On: August 1, 2026

    What Really Prevents Costly Downtime? The Missing Link Between Maintenance ...

  • Chilean Crushing Plant Operator Safety Training Guide: Preventing Falls and Foreign Object Ingress
    • On: August 1, 2026

    Chilean Crushing Plant Operator Safety Training Guide: Preventing Falls and ...

    • On: August 1, 2026

    Selecting a Mobile Crusher in Indonesia: Navigating Rainy Seasons and ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved