Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocPundit
Added: August 12, 20262026-08-12T05:42:18-04:00 2026-08-12T05:42:18-04:00In: Mining Finance and Economy

What's the right way to structure a Monte Carlo simulation for commodity price risk in a feasibility study?

  • 0
  • 0

A feasibility study conducts a thorough evaluation of the feasibility of a project, which significantly depends on the prediction of cost and revenue. In industries such as mining and agriculture, one of the key factors of unfeasibility is the risk of losses connected with fluctuating prices on commodities. The assessment of the risks can be carried out through the Monte Carlo simulation approach, which involves running multiple computations with random input values to analyze the range of results in terms of the probabilities.

The first thing to do when designing such simulations is constructing a proper financial deterministic model. This implies an evaluation of basic cash flows including operating costs, capital expenditure, and production. Next, it is important to consider which of these factors are the main sources of uncertainty in order to properly account for them. Although there are risks associated with operating costs, commodity price changes have always played a dominant role in projects’ value changes. Identifying these specific variables for which the random sampling will take place is vital (Kamel et al., 2023).

The next step involves assigning proper probability distributions or stochastic processes to individual price components. In some cases, the simple normal distribution may be enough, while commodities show complicated stochastic behavior such as mean reversion or even geometric Brownian motion. The use of a mean-reverting model calibrated with the help of the historical time-series will prevent the simulation from generating completely unreasonable values of rising forever price of commodity in question (Brande et al., 2023).

One more issue which is quite often ignored in building the model and yet important is dealing with correlations between different stochastic variables. It should be noted that commodity prices are connected by various correlations. For example, the price of output metal and energy cost of input materials may show the same behavior. It will distort all project’s variance estimation greatly because these two variables can be considered completely independent within the framework of the simulation.

After conducting an analysis of prices’ distributions and correlation, the simulation is performed several times. In each such trial, there is random choice of the variables considering their specified distribution and the calculation of NPV and IRR of the project. As a result, the financial measures turn into distributions. The outcome is not an exact NPV, but the probability distribution that shows how likely to be the positive return on investment compared to capital loss probabilities (Ronyastra et al., 2024).

As a final point, however, the proper design of the Monte Carlo simulation itself means little compared to the strategic information that can be derived from it. Analysts need to analyze probability distributions to establish their value at risk and the level at which they become nonviable. Using such risk assessment, stakeholders can then craft their hedging policies to reduce risks. In this way, organizations make sound decisions amid uncertainty and protect their capital investment based on statistics.

References

Brande, M. d. R., Santos, D. F. L., Fialho, N. S., Proença, D. C., Ojeda, P. G., Godói, F. C. M., Roubach, R., & Bueno, G. W. (2023). Economic and financial risks of commercial tilapia cage culture in a neotropical reservoir. Heliyon, 9(6), e16336. https://doi.org/10.1016/j.heliyon.2023.e16336

Kamel, A., Elwageeh, M., Bonduà, S., & Elkarmoty, M. (2023). Evaluation of mining projects subjected to economic uncertainties using the Monte Carlo simulation and the binomial tree method: Case study in a phosphate mine in Egypt. Resources Policy, 80, 103266. https://doi.org/10.1016/j.resourpol.2022.103266

Ronyastra, I. M., Saw, L. H., & Low, F. S. (2024). Monte Carlo simulation-based financial risk identification for industrial estate as post-mining land usage in Indonesia. Resources Policy, 89, 104639. https://doi.org/10.1016/j.resourpol.2024.104639

What's the right way to structure a Monte Carlo simulation for commodity price risk in a feasibility study?
0
  • 0 0 Comments
  • 284 Views
  • 284 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What's the practical method for calculating break-even strip ratio in an open-pit optimization?
  • How to calculate the true all-in sustaining cost (AISC) when byproduct credits are volatile?
  • How to evaluate whether a streaming deal or royalty financing better preserves project upside?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Sponsored Ads

aalan
  • Recent
  • Mining ERP: Bridging the Gap Between Planned and Actual Costs
    • On: September 14, 2026

    Mining ERP: Bridging the Gap Between Planned and Actual Costs

  • Ore Crushing Plant for Mountain Mines: Managing Access, Transport, and Production
    • On: September 12, 2026

    Ore Crushing Plant for Mountain Mines: Managing Access, Transport, and ...

  • How Does the Crushing Chamber Design of Aggregate Crushing Equipment Affect Output and Finished Product Quality?
    • On: September 12, 2026

    How Does the Crushing Chamber Design of Aggregate Crushing Equipment ...

  • How Can Mine Construction Teams Reduce Rework During Fast-Track Projects?
    • On: September 8, 2026

    How Can Mine Construction Teams Reduce Rework During Fast-Track Projects?

  • The Mine in Your Pocket: Why Mobile ERP Is Reshaping Mining Operations
    • On: September 8, 2026

    The Mine in Your Pocket: Why Mobile ERP Is Reshaping ...

  • How Concrete Is Used in Crusher and Screening Plant Foundations at Guatemalan Mines
    • On: September 4, 2026

    How Concrete Is Used in Crusher and Screening Plant Foundations ...

  • Portable Crusher Plant for Hard Rock Mines: How to Design the Crushing Circuit Before Grinding
    • On: September 3, 2026

    Portable Crusher Plant for Hard Rock Mines: How to Design ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved