Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocExplainer
Added: October 28, 20242024-10-28T07:21:25-04:00 2024-10-28T07:21:25-04:00In: Mining Operations

Guide on Charging Explosives During Blasting

  • 0
  • 0
Preparation of the Blast Site
  • Mark and Drill Holes: Begin by marking and drilling blast holes to the specified depth, according to the blast design plan. The layout and spacing of the holes should align with the desired fragmentation size.
  • Clear the Blast Area: Ensure all non-essential personnel are at a safe distance from the blast site before handling explosives.
Choose the Explosive Type
  • Match the type of explosive (e.g., ANFO, emulsion, e.t.c) to the rock type, hole size, and site conditions. Lower-energy explosives work for soft rocks, while higher-energy explosives are necessary for hard rock.
  • Initiation Systems: Select appropriate initiation systems such as detonators (electric, non-electric, or electronic) and primers, based on delay timing and blast sequence requirements.
Charging the Explosive
  • Priming: Insert primers and detonators first, ensuring they are placed securely in the hole and connected properly. Priming assists with initiating the main explosive charge.
  • Loading Explosives: Carefully load the explosive material into the hole to the required height or weight. Avoid using metal tools to prevent sparks; use non-metallic tamping rods if needed.
  • Stemming: Seal the top of each hole with stemming material (e.g., crushed stone or gravel). Stemming keeps the explosive force confined within the borehole, increasing blasting efficiency and minimizing fly rock.
Connecting the Blast Circuit
  • Wiring Sequence: Connect the blast holes in a planned sequence to control the detonation timing. For complex blasts, use delays or electronic detonators for precision.
  • Inspect Connections: Double-check all connections for continuity and proper placement.
Final Inspection
  • Safety Check: Conduct a final inspection of the blast layout and all connections. Ensure all personnel are in a safe location before detonation.
  • Alert Area and Detonate: Sound a warning to clear personnel from the area, confirm the blast site is clear, and proceed with the controlled detonation as per site protocol.
Safety Guide on Explosive Handling

Only licensed and trained personnel should handle, charge, or detonate explosives. Conduct regular safety drills, training on explosive handling, and emergency response. In Case of Misfire,learly mark misfired holes and communicate the situation to all personnel.

Delay Re-entry: Only attempt to re-enter the blast area after a sufficient wait period, per industry standards (typically 30 minutes to several hours).

Disposal by Experts: Engage experienced personnel or the explosives manufacturer for safe disposal or neutralization of the misfired charge.

Post-Blast Inspection

Check for Hazards: Inspect for any unexploded charges, fly rock, or residual explosive material after each blast.

Credits to Blessing Olamide Taiwo (Text) and Eugene Preis (Video)
https://www.miningdoc.tech/wp-content/uploads/2024/10/Eugene.mp4
0
  • 0 0 Comments
  • 353 Views
  • 353 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • What are factors to be considered when drilling a hole?
  • What are safety measures in rock bolting?
  • What are common types of rock bolts?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Common applications of rock bolts.
    • On: June 24, 2025

    Common applications of rock bolts.

  • Common rock bolt installation methods
    • On: June 24, 2025

    Common rock bolt installation methods

  • Niger to nationalise Somair uranium venture operated by France's Orano
    • On: June 20, 2025

    Niger to nationalise Somair uranium venture operated by France's Orano

  • Rio Tinto IOC invests $800,000 to expand childcare offering at Lil Snowflakes daycare
    • On: June 20, 2025

    Rio Tinto IOC invests $800,000 to expand childcare offering at ...

  • Gold prices holds steady, platinum scales over 10-year high.
    • On: June 19, 2025

    Gold prices holds steady, platinum scales over 10-year high.

  • What are the limitations of using conveyor belts underground?
    • On: June 18, 2025

    What are the limitations of using conveyor belts underground?

  • Purpose of a ventilation-on-demand (VoD) system
    • On: June 18, 2025

    Purpose of a ventilation-on-demand (VoD) system

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
LASE Industrielle Lasertechnik GmbH

LASE Industrielle Lasertechnik GmbH

  • 13 Posts
  • 0 Comments
Professional
Job Posting (View more here)


Job Description:
Open Pit Cost Controller

Location: DR-Congo


Apply on the company website


Job Description: Health and Safety Coordinator


Location: Canada

Click here to apply


Job: Project Mine Geologist


Location: Australia


Apply on the company website
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2025 Mining Doc. All Rights Reserved