Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocExplainer
Added: October 28, 20242024-10-28T07:21:25-04:00 2024-10-28T07:21:25-04:00In: Mining Operations

Guide on Charging Explosives During Blasting

  • 0
  • 0
Preparation of the Blast Site
  • Mark and Drill Holes: Begin by marking and drilling blast holes to the specified depth, according to the blast design plan. The layout and spacing of the holes should align with the desired fragmentation size.
  • Clear the Blast Area: Ensure all non-essential personnel are at a safe distance from the blast site before handling explosives.
Choose the Explosive Type
  • Match the type of explosive (e.g., ANFO, emulsion, e.t.c) to the rock type, hole size, and site conditions. Lower-energy explosives work for soft rocks, while higher-energy explosives are necessary for hard rock.
  • Initiation Systems: Select appropriate initiation systems such as detonators (electric, non-electric, or electronic) and primers, based on delay timing and blast sequence requirements.
Charging the Explosive
  • Priming: Insert primers and detonators first, ensuring they are placed securely in the hole and connected properly. Priming assists with initiating the main explosive charge.
  • Loading Explosives: Carefully load the explosive material into the hole to the required height or weight. Avoid using metal tools to prevent sparks; use non-metallic tamping rods if needed.
  • Stemming: Seal the top of each hole with stemming material (e.g., crushed stone or gravel). Stemming keeps the explosive force confined within the borehole, increasing blasting efficiency and minimizing fly rock.
Connecting the Blast Circuit
  • Wiring Sequence: Connect the blast holes in a planned sequence to control the detonation timing. For complex blasts, use delays or electronic detonators for precision.
  • Inspect Connections: Double-check all connections for continuity and proper placement.
Final Inspection
  • Safety Check: Conduct a final inspection of the blast layout and all connections. Ensure all personnel are in a safe location before detonation.
  • Alert Area and Detonate: Sound a warning to clear personnel from the area, confirm the blast site is clear, and proceed with the controlled detonation as per site protocol.
Safety Guide on Explosive Handling

Only licensed and trained personnel should handle, charge, or detonate explosives. Conduct regular safety drills, training on explosive handling, and emergency response. In Case of Misfire,learly mark misfired holes and communicate the situation to all personnel.

Delay Re-entry: Only attempt to re-enter the blast area after a sufficient wait period, per industry standards (typically 30 minutes to several hours).

Disposal by Experts: Engage experienced personnel or the explosives manufacturer for safe disposal or neutralization of the misfired charge.

Post-Blast Inspection

Check for Hazards: Inspect for any unexploded charges, fly rock, or residual explosive material after each blast.

Credits to Blessing Olamide Taiwo (Text) and Eugene Preis (Video)
https://www.miningdoc.tech/wp-content/uploads/2024/10/Eugene.mp4
0
  • 0 0 Comments
  • 1k Views
  • 1k Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Choosing Tailings Management Systems: Lessons from Grasberg Mine, Indonesia
  • STEINERT and Ferbasa are leading the way in sensor-based sorting in Latin America.
  • Do you know the Odyssey mine in Canada?

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • How Aerial Mapping Is Transforming Mining Site Inspections and Maintenance
    • On: January 19, 2026

    How Aerial Mapping Is Transforming Mining Site Inspections and Maintenance

  • Application of Hydraulic Fracturing in Mining and the Role of Inflatable Packers
    • On: January 16, 2026

    Application of Hydraulic Fracturing in Mining and the Role of ...

  • Rio Tinto and BHP explore collaboration to mine up to 200 million tonnes of Pilbara iron ore
    • On: January 16, 2026

    Rio Tinto and BHP explore collaboration to mine up to ...

  • Mali gold output plunges 23% as Barrick halt, tougher rules reshape sector
    • On: January 16, 2026

    Mali gold output plunges 23% as Barrick halt, tougher rules ...

  • Industrial laser measurement solutions by LASE
    • On: January 15, 2026

    Industrial laser measurement solutions by LASE

    • On: January 14, 2026

    What's Sand Washing Machine | Types | Working Principles

  • Dry Stacking: The Future of Safe and Sustainable Tailings Management
    • On: January 14, 2026

    Dry Stacking: The Future of Safe and Sustainable Tailings Management

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved