Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
  • Jobs

Mining Doc Latest Posts

Mining Doc
  • 1
  • 1
Mining Doc
Added: March 25, 20232023-03-25T16:05:13-04:00 2023-03-25T16:05:13-04:00In: Mining Case Studies

How can a split line be created for Protecting Hanging Wall Structures in Underground Mines?

  • 1
  • 1

While working in an Northern Ontario underground nickel mine in the 90’s, a problem arose that required the invention and design of a methodology using a shear line that could secure the integrity of a hanging wall (Norite) at the contact of an orebody where impurities were located. These impurities would affect the milling operation when mixed in with ore.

The idea was to develop a shear line (a controlled crack line – shear hole to shear hole) between the hanging wall contact and the rest of a blast to prevent the mixing of ore with the impurities. The shear line would stop cracking from the blast reaching and damaging the hanging wall. In theory this should prevent the impurities from mixing with the ore. Electronic detonators were off in the distant future, so this author still had to cope with NONEL delays.

If the creation of a viable shear line was achievable, it could be extended to those cases when a hanging wall needed to be stabilized in the mining of narrow vein gold mines with the view of limiting dilution resulting from blasting close to the contact zone of host rock and gold veins. In this case shear blastholes would be drilled parallel to the ore contact at a set distance away to avoid damage to the contact. Presplitting or splitting investigations in the past found that high gas producing explosives would produce a better fracture and might reduce or eliminate fine hairline cracks that may appear on borehole walls. In addition, there were claims the splitting action required the collision of stress wave reflections from adjacent shear holes from a shock viewpoint which may be in error.

This example/application of shear splitting in front of a hanging wall seemed to indicate that the shock wave magnitude from a detonating decoupled explosive might have had the strength to pull out scabs from the inside walls on opposite sides of shear boreholes. This scabbing action would create a notch that could easily concentrate gas expansion for the purpose of creating a well-defined split line. Figure 1 illustrates the idea of a scabbing mechanism produced by shock wave reflection from shear borehole walls.

In this case, it was desirous to use a high-shock cord based explosive (Primaflex) in order to create a notch from tensile scabs of adjacent borehole walls for gases to concentrate for the purpose of creating a well- defined split line.

Follow the link to download case study.

Split line

How can a split line be created for Protecting Hanging Wall Structures in Underground Mines?
0
  • 0 0 Comments
  • 359 Views
  • 359 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Operating Sovereignty — The New Currency of Trust in African Mining
  • The Power of Influence: Why Strategic Lobbying Defines the Future of Mining in Africa
  • The Proof Mine — Mining Truth in the Age of Digital Accountability

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Ads – Mining Solutions

aalan
  • Recent
  • The Implementation Path of Systematic Solutions for Energy-Saving Crushing Production Lines in Latin America
    • On: November 11, 2025

    The Implementation Path of Systematic Solutions for Energy-Saving Crushing Production ...

  • Rio Tinto and Canada Growth Fund announce transaction to advance Canadian production of scandium
    • On: November 7, 2025

    Rio Tinto and Canada Growth Fund announce transaction to advance ...

  • ArcelorMittal posts third-quarter profit beat, flags optimism for 2026
    • On: November 7, 2025

    ArcelorMittal posts third-quarter profit beat, flags optimism for 2026

  • Funds amass record bull bets on aluminium as market narrative turns.
    • On: November 6, 2025

    Funds amass record bull bets on aluminium as market narrative ...

  • 10 Workplace safety tips for a secure environment
    • On: November 6, 2025

    10 Workplace safety tips for a secure environment

  • 13 Essential Construction Site Safety Tips: A Comprehensive Guide (2025)
    • On: November 6, 2025

    13 Essential Construction Site Safety Tips: A Comprehensive Guide (2025)

  • Construction Safety Management: Navigating Common Risks and Key Responsibilities on Site
    • On: November 6, 2025

    Construction Safety Management: Navigating Common Risks and Key Responsibilities on ...

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 21 Posts
  • 0 Comments
Beginner
Job Posting (View more here)


Job De
scription: Alternate Superintendent - Metallurgy

Location: Papua New Guinea


Apply on the company website


Job Description: Metallurgy Superintendent


Location: USA

Click here to apply


Job: Mill - Control Room Operator


Location: Canada


Apply on the company website
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2025 Mining Doc. All Rights Reserved