Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocEnlightened
Added: September 22, 20262026-09-22T07:12:55-04:00 2026-09-22T07:12:55-04:00In: General Information

Let’s talk about Bakyrchik operating mine

  • 0
  • 0

The Bakyrchik Mining Company, a member of Solidcore Resources Group, operates the Kyzyl gold project located in the Abai region of eastern Kazakhstan. Commercial operations began in 2018 at the Bakyrchik deposit, an asset historically recognized as one of the world’s most technically challenging gold deposits due to double refractory ore geology. Fine-grained gold locked within arsenopyrite and pyrite matrices resisted large-scale industrial extraction for nearly six decades following its initial geological discovery in the 1950s. Modern engineering solutions, automated digital monitoring, and targeted capital investment successfully unlocked the asset. In June 2026, the operation surpassed a major historic milestone by extracting more than 100 tonnes of gold contained in mined ore. This technical review summarizes the deposit geology, mining strategy, metallurgical flowsheet, and digital infrastructure that drive performance at the Bakyrchik enterprise.

The Kyzyl project encompasses the Bakyrchik and Bolshevik gold deposits situated along the 11.5-kilometre East-West striking Kyzyl Shear Zone. Dip angles range between 30° and 40° north, with mineralization extending to depths from 1 to 3.5 kilometres. Ore bodies feature JORC-compliant probable reserves estimated at 29.15 million tonnes with an average grade of 7.7 grams of gold per tonne, representing 7.3 million ounces of contained gold.

The operational strategy follows a two-phase life-of-mine plan. Phase One utilizes conventional open-pit mining incorporating drilling, blasting, and truck-and-shovel loading at a design capacity of 1.8 million tonnes of ore per annum. Phase Two involves a transition to underground extraction scheduled for 2028, deploying an underhand cut-and-fill mining method to extract deeper resources below the open pit at a planned capacity of 1.2 million tonnes per annum.

The processing facilities are based on a 1.8 mtpa capacity sulphide flotation plant, which has gold recoveries of 93.44% and 220,000 tonnes per year concentrate production. Processing of refractory ores requires a two-stream beneficiation process. Low-carbon concentrate undergoes POX treatment at the Amur Hydrometallurgical Plant where gold gets transformed into 95%-96% gold-containing alloy before being refined in Kazakhstan. High carbon concentrate is processed at the Kazakhmys Corporation LLP. The company is constructing the new hydrometallurgical plant in Pavlodar region of Kazakhstan which will be the first Central Asian facility for processing refractory concentrate, where Bakyrchik concentrate will be supplied beginning from 2028.

Digital automation supports all stages of mine dispatch and equipment maintenance. A private 4G/LTE cellular network with six base stations integrates automated dispatching, bucket positioning, radio communications, and real-time machine telemetry. The in-house ‘POLINA’ automated dispatching system allocates haul trucks dynamically based on excavator telemetry and onboard sensors. Environmental management maintains a 100% closed-loop water recycling system and backfills 10% to 13% of overburden waste into exhausted pit areas annually.

The successful industrial execution at the Bakyrchik deposit illustrates how advanced flotation techniques, hydrometallurgical processing, and digital infrastructure can commercialize double refractory gold ores. Solidcore Resources has transformed an asset once considered unviable into a cornerstone of Kazakhstan’s gold mining sector. As the enterprise prepares for its scheduled transition to underground mining and local POX processing in Pavlodar, Bakyrchik establishes a technical benchmark for refractory gold extraction across Central Asia.

Let’s talk about Bakyrchik operating mine
0
  • 0 0 Comments
  • 35 Views
  • 32 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • How is the shift to circular economy principles affecting tailings reprocessing economics?
  • How are autonomous haulage rollouts changing workforce planning at a company-wide level?
  • Let’s talk about Damang Gold Mine

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalan

Sidebar

Sponsored Ads

aalan
  • Recent
  • Legal Validity of OTR Tire Supply Contracts: How Technical Appendices Protect the Interests of Mining Enterprises
    • On: September 21, 2026

    Legal Validity of OTR Tire Supply Contracts: How Technical Appendices ...

  • Mobile Crusher for Sale Philippines for Producing Road Base and Construction Aggregates
    • On: September 18, 2026

    Mobile Crusher for Sale Philippines for Producing Road Base and ...

  • Customs Clearance and Logistics Practices for Imported Crusher to Chile
    • On: September 18, 2026

    Customs Clearance and Logistics Practices for Imported Crusher to Chile

  • Mining ERP: Bridging the Gap Between Planned and Actual Costs
    • On: September 14, 2026

    Mining ERP: Bridging the Gap Between Planned and Actual Costs

  • Ore Crushing Plant for Mountain Mines: Managing Access, Transport, and Production
    • On: September 12, 2026

    Ore Crushing Plant for Mountain Mines: Managing Access, Transport, and ...

  • How Does the Crushing Chamber Design of Aggregate Crushing Equipment Affect Output and Finished Product Quality?
    • On: September 12, 2026

    How Does the Crushing Chamber Design of Aggregate Crushing Equipment ...

  • How Can Mine Construction Teams Reduce Rework During Fast-Track Projects?
    • On: September 8, 2026

    How Can Mine Construction Teams Reduce Rework During Fast-Track Projects?

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 26 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved