Sign In


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.


Have an account? Sign In Now

Sorry, you do not have permission to Add a Post, You must login to Add a Post.


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add Article.


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this Post should be reported.

Please briefly explain why you feel this Comment should be reported.

Please briefly explain why you feel this user should be reported.

Mining Doc Logo Mining Doc Logo Mining Doc Logo
Sign InSign Up

Mining Doc

Mining Doc Navigation

  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses
Search
Sign up

Mobile menu

Close
join for free
  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges
  • Home
    • About
    • Contact us
  • Mining articles
  • Online Courses

Mining Doc Latest Posts

Mining Doc
  • 0
  • 0
Mining DocProfessional
Added: June 18, 20252025-06-18T06:00:10-04:00 2025-06-18T06:00:10-04:00In: Mining Engineering

How is overbreak controlled during blasting?

  • 0
  • 0

Blasting techniques have been developed to control overbreak at excavation limits. The operator must decide the ultimate purpose of the control technique, before selection of the technique can be made. Some techniques are used to produce a cosmetically appealing wall with little or no concern for stability within the rock mass.

Other techniques are used to provide stability by forming a fracture plane before any production blasting is conducted. This second technique may or may not be as cosmetically appealing, but from a stability standpoint, performs its function. Overbreak control methods can be broken down into three types: presplitting, trim (cushion) blasting and line drilling.

Presplitting utilizes lightly loaded, closely spaced drill holes, fired before the production blast. The purpose of presplitting is to form a fracture plane across which the radial cracks from the production blast cannot travel. The fracture plane formed may be cosmetically appealing and allow the use of steeper slopes with less maintenance. Presplitting should be thought of as a protective measure to keep the final wall from being damaged by the production blasting.

Trim blasting is a control technique which is used to clean up a final wall after production blasting has taken place. The production blasting may have taken place many years earlier or could have taken place on an earlier delay within the same blast. Since the trim row of holes along a perimeter is the last to fire in a production blast, it does nothing to protect the stability of the final wall. Radial fractures from production blasting can go back into the final wall. Mud seams or other discontinuities can channel gasses from the production blast areas into the final wall. The sole purpose of a trim blast is to create a cosmetically appealing, stable perimeter. It offers no protection to the wall from the production blast.

Line drilling is an expensive technique, that under the proper geologic conditions, can be used to produce a cosmetically appealing final wall. It may, under proper circumstances, help protect the final contour from radial fractures by acting as stress concentrators causing the fracture to form between line drill holes during the production blasting cycle. If, on the other hand, the wall contour was extremely important, one could not depend on line drilling to necessarily protect the final wall. Line drilling is more commonly used in conjunction with either presplitting or trim blasting rather than being used alone. Although the use of control blasting is more common for surface excavations, it has been successfully used underground.

Source: Rock Blasting and Control, U.S. Department of Transportation Federal Highway Administration, Publication No. FHWA-HI-92-001 Prepared in 1991.
0
  • 0 0 Comments
  • 579 Views
  • 579 Reactions
  • 0 Followers
  • 0
    • Report
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

Related Posts

  • Rock mechanics: the unsung hero of modern mines
  • Advanced simulations make mines predictable
  • 80% of fragmentation problems don’t come from explosives… they come from drilling

You must login to add an Comment.


Forgot Password?

Need An Account, Sign Up Here
aalanaalan

Sidebar

Ads – Mining Solutions

aalanaalan
  • Recent
  • Global Demand for Stationary Concrete Batching Plants in the Mining Sector
    • On: February 23, 2026

    Global Demand for Stationary Concrete Batching Plants in the Mining ...

    • On: February 23, 2026

    Mining Drone Technology: How Smart Aerial Systems Are Transforming Modern ...

  • Newmont beats profit forecast, plans $1.4 billion investment in Newcrest assets
    • On: February 20, 2026

    Newmont beats profit forecast, plans $1.4 billion investment in Newcrest ...

  • Rio Tinto reports solid 2025 results as copper growth and cost discipline drive performance
    • On: February 20, 2026

    Rio Tinto reports solid 2025 results as copper growth and ...

  • White House: no changes to Trump metals tariffs unless president announces them.
    • On: February 13, 2026

    White House: no changes to Trump metals tariffs unless president ...

  • Middlemount Mine Australia received a 7-year extension approval for coal mining until 2044.
    • On: February 13, 2026

    Middlemount Mine Australia received a 7-year extension approval for coal ...

  • Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones
    • On: February 13, 2026

    Kamoa-Kakula DRC: Phase 4 expansion hitting critical production milestones

Go to Home page to view more

Top Members

Olena Skyba

Olena Skyba

  • 150 Posts
  • 2 Comments
Pundit
Marcial

Marcial

  • 91 Posts
  • 0 Comments
Enlightened
Jean Marais (Sanodea Group)

Jean Marais (Sanodea Group)

  • 25 Posts
  • 0 Comments
Beginner
Trending on Mining Doc

Trending Communities

Fixed Plant General Information Geology Mining Case Studies Mining Doc Documentary Mining Engineering Mining Events Mining Finance and Economy Mining Human Resources Mining Industry Research Mining Operations Mining Software Solutions Mining Sustainability Mining Technology Solutions Mobile Plant Equipment

Explore

  • Home
  • Online courses
  • Case study
  • Mining Community
  • Solutions listing
    • Lase Solutions
    • O-PitBlast Solutions
    • Continuous Mining
    • Longwall mining
    • Geosight Scanners
    • LoopX AI
    • Terafil solutions
    • Blasting solutions
    • Geotechnical
    • Submersible Pumps
    • Mine rescue system
    • Ore sorting
    • Whittle Consulting Solutions
  • Add Blog
  • Feed
  • User Profile
  • Posts
    • New Posts
    • Trending Posts
    • Must read Posts
    • Hot Posts
  • Polls
  • Badges

Footer

Mining Doc

Join our community and connect with other people in the Mining industry for knowledge sharing.

Legal Stuff

  • Privacy Policy
  • Terms of Service

Help

  • Support
  • FAQs
  • How to add new content and how to promote a content
  • Compliance and guidelines
  • Subscribe to Mining Doc

Follow

© 2026 Mining Doc. All Rights Reserved